My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-05-19_REVISION - M1977285 (32)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977285
>
2009-05-19_REVISION - M1977285 (32)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:39:02 PM
Creation date
5/27/2009 2:32:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977285
IBM Index Class Name
REVISION
Doc Date
5/19/2009
Doc Name
EPP amendment (AM-03) SWMP appendix A,B & C (part 6)
From
Denison Mines
To
DRMS
Type & Sequence
AM3
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COR-030000 Stormwater Management Plan <br />6. MAINTENANCE (§I.D.7 AND §I.D.8) <br />a) BMP Maintenance (§I.D.7) <br />All erosion and sediment control practices and other protective measures identified in the <br />SWMP will be maintained in effective operating condition in accordance with Section 3.c), <br />Appendix B and Appendix C of this SWMP. BMPs that are not adequately maintained in <br />accordance with good engineering, hydrologic and pollution control practices are considered <br />to be no longer operating effectively and will be modified or replaced. BMPs implemented <br />at the site must be adequately designed and maintained to provide control for all potential <br />pollutant sources associated with the mining activity to prevent pollution or degradation of <br />State waters. Maintenance of BMPs will occur anytime that the condition of the BMP or the <br />accumulation of sediment or debris adversely impacts the functioning of the BMP. <br />b) Replacement and Failed BMPs (§I.D.8) <br />Adequate site assessment will be performed as part of comprehensive inspection and <br />maintenance procedures, to assess the adequacy of BMPs at the site, and the necessity of <br />changes to those BMPs to ensure continued effective performance. Where site assessment <br />results in the determination that new or replacement BMPs are necessary, the BMPs will be <br />installed or maintained in accordance with this SWMP. Where BMPs have failed, resulting <br />in noncompliance, they will be addressed as soon as possible, immediately in most cases, to <br />minimize the discharge of pollutants. When new BMPs are installed or BMPs are replaced, <br />the SWMP will be updated. <br />f? <br />Lianson comes (UbA) corp. Sunday Mines SWMP <br />26
The URL can be used to link to this page
Your browser does not support the video tag.