My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-12-21_GENERAL DOCUMENTS - C1981008
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981008
>
2001-12-21_GENERAL DOCUMENTS - C1981008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 2:18:34 PM
Creation date
5/27/2009 1:59:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981008
IBM Index Class Name
General Documents
Doc Date
12/21/2001
Doc Name
Proposed Decision & Findings of Compliance for SL7
From
Phase II & III on 134.9 acres NH1 Permit
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
approved reclan?atian plan," Postwmining topography far the New Horizon Mine ? area was approved far <br />Phase ? bond releases in 1)ecember,1994 ESL-03), and August,1996 ?,?L-04). <br />PHASE I? <br />Rule 3.03.1 ?2)?b? states, "'?Up to eighty-five percent of the applicable bond amount shah be released open <br />the establishment of vegetation which supports the approved post:-mining land use and which meets the <br />approved success standard far cover... based on statistically valid data collected during a single year of <br />the liability period". In regard to Phase ? bond release, Rule 3.03.??3}fib} also states, "No mare than sixty <br />??0}percent of the bond shall be released sa long as the lands to which the release would be applicable <br />are contributing suspended solids to streamflaw ar runoff outside the permit area in excess of pre-mining <br />levels as detern?.ined by baseline data or in excess of levels determined an adjacent non-mined areas'". <br />The New Horizon # 1 site is divided iota 3 permit areas and 4 vegetation sampling areas. Vegetation <br />transect data far years 1999 and 2000 vegetation studies by Intermountain Resource Inventories Inc. were <br />included in the application. Par this report, the 3 permit areas are Areas lA,1B, and Area 2 (sometimes <br />called 1C ar the Rice Tract}. Area 2 was used only far sedimentalogy calculations for the elimination <br />of pond 001 NPI)ES autfall. <br />The New Horizon #1 Mine area was a sagebrush vegetation type community prior to development into <br />a strip ?.ine by Edna Caal Company in 1958. Peabody Caal Company bought the mine from Fdna in <br />193 and operated it until 1983. The greatest percentage of disturbance in the Mine 1 area was caused <br />by Peabody Coal Company's mining. The majority of disturbance was pre-law ar re-mining during the <br />interim S14ICRA rules, Far the areas of topsail salvage, redistribution standards, woody plant densities, <br />and vegetation success criteria, Rule x,15.10 apply. <br />Peabody conducted reclamation an their sites Pram 19?8 to 1990, Western Fuels-Colorado purchased the <br />mine in 199 and began mining in what is now called the New ;Horizon #2 Mine, south of the older <br />Peabody site. The reclamation standards of the New Plari?an #1 area are given. in Tab 22 of the permit <br />document. In 1994, WPC applied for a Phase 1 & 2 band release but only received Phase 1 band release <br />for Areas la and lb Mine 1?. In Tune of 199?b, WFC received a Phase 1 release far Area lc. In 1995 and <br />199, WFC irrigated and re-seeded most of Permit Area 1 c Mine 1 ?, therefore, this area is net listed far <br />the current Phase 2 and 3 band release. <br />All topsoil that was salvaged during this timeframe was redistributed to the fullest extent passible. <br />Depths far the topsail re-distribution ranged from 0 to 1,5 feet. <br />In 1'999, a revision to the reclamation standards of Tab 2,2 was approved to allow a dry rangeland <br />reference area instead of the previous upland sagebrush reference area. In the year 1999, vegetative <br />sampling was conducted for Vegetation Sampling Areas 1-A, 1-8, and Area 2 as well as the upland <br />sagebrush reference area and the dry rangeland reference area. In the year 2000, vegetative sampling was <br />conducted far Vegetation S ampling Areas 1-A and 1-B as well as the upland sagebrush reference area <br />and the dry rangeland reference area. Both years also measured alfalfa production from the hayfield in <br />Permit Area 1c, although this area is not requested for band release. <br />PHASE III <br />Rule 3.03.1 {2}tc} states that the final portion of performance bond, '"shall be released when the permttee <br />has successfully completed all surface coal mining reclamation operations in accordance with the
The URL can be used to link to this page
Your browser does not support the video tag.