Section 6
<br />References
<br />Ford, R.C., Pierce,: S.A., Ankeny, M.D., Kelsey, J., 2000, Evaluation and Management of Acid •.,
<br />Drainage Risk from Spent Ore, El Abra Mine, Chile, in Semi-Arid Mine Waste Issues, ICARD 2000-
<br />Proceedings from the 5th International Conference on Acid Mine Drainage.
<br />Freeze, R.A. and Cherry, J.A. 1979. Groundwater. Prentice-Hall Inc. Englewood Cliffs, N.J.
<br />Guymon, G.L., 1994, Unsaturated Zone Hydrology, PTR Prentice Hall, Englewood Cliffs,
<br />NewJersey 07632, p. 81-83
<br />Seki, K., 2007, SWRC Fit- A Nonlinear Fitting Program with a Water Retention Curve for Soils Having
<br />Unimodal and Bimodal Pore Structure, Hydrology and Earth System Sciences Discussions, Vol 4.
<br />Swanson, D.A., Savci, G., Danziger, G., Williamson, A., Barnes, C., 2000, Unsaturated Hydrologic
<br />Assessment of Waste Rock Stockpiles in Semi-Arid Climates, in Semi-Arid Mine Waste Issues,
<br />ICARD 2000-Proceedings from the 5th International Conference on Acid Mine Drainage.
<br />U.S. Bureau of Land Management (BLM). 2004. Rick Management Criteria for Metals at BLM
<br />Mining Sites. Technical Note 390 Rev. October.
<br />BLM, 2008. Draft San Juan Land Management Plan and Draft Environmental Impact Assessment, US
<br />Bureau of Land Management.
<br />U.S. Environmental Protection Agency (EPA). 2008. EPA Region 9, Regional Screening Level
<br />Tables. See http://www.eRa.gov/region09/sul2erfund/prg/rsl-tzible.html.
<br />•
<br />EPA. 1997. Relative Bioavailability of Arsenic in Mining Wastes, EPA Region 8 Document.
<br />December.
<br />EPA. 1996. Soil Screening Guidance: User's Guide. EPA/540/R-96/1)18. July.
<br />•
<br />cm 6-2
<br />T: 64 86-Denison Mines\Task Order 3 - DMO Sampling and Analysis Plan\Task 3.12 - Soil, Ore, Rock Data Assessment Report%Sunday Rock Potporttfral reportlReportlFinal Sunday Mimi. Group Soil Ore Rock
<br />Data Assessment Report_051509AM
|