Laserfiche WebLink
Section 1 <br />Introduction <br />...an operator demonstrates to the board at the time of applying for a permit or <br />at a subsequent hearing that toxic or acid chemicals are not stored or used on- <br />site and that acid- or toxic-producing materials will not be used, stored, or <br />disturbed in quantities sufficient to adversely affect any person, any property, <br />or the environment. <br />Denison has prepared this EPP in accordance with Denison s corporate commitment <br />to environmental protection, and their obligation for protection of human health, <br />property, and the environment in conformance with the duties of operators as <br />prescribed by the CMLRA. <br />This document is generally organized in accordance with existing rules at HRMMR § <br />6.4.20. However, as mentioned previously, the rules have not yet been modified to <br />provide specific direction for conventional uranium mines designated as DMOs by <br />Colorado HB 1161. Therefore, the organization of this document has been modified <br />somewhat to address site-specific issues. This document is organized as follows: <br />¦ Section 2.0- Potential for Adverse Impacts; [HRMMR §§ 6.4.20(1) and 6.4.20(14)] <br />¦ Section 3.0- Environmental Protection Measures and Monitoring Required by Other <br />Agencies; [HRMMR §§ 6.4.20(3) and 6.4.20(4)] <br />¦ Section 4.0- Designated Chemical(s) Evaluation; [HRMMR § 6.4.20(5)] <br />¦ Section 5.0- Handling of Designated Chemicals and Acid- or Toxic-forming <br />Materials; [HRMMR § 6.4.20(6)] <br />¦ Section 6.0- Evaluation of Proposed and Existing Environmental Protection <br />Facilities; [HRMMR § 6.4.20(7)] <br />¦ Section 7.0- Groundwater Information; [HRMMR § 6.4.20(8)] <br />¦ Section 8.0- Groundwater Quality; [HRMMR § 6.4.20(9)] <br />¦ Section 9.0- Surface Water; [HRMMR § 6.4.20(10)] <br />¦ Section 10- Surface Water Quality Data; [HRMMR § 6.4.20(11)] <br />¦ Section 11- Water Quality Monitoring Plan; [HRMMR § 6.4.20(12)] <br />¦ Section 12- Climate; [HRMMR § 6.4.20(13)] <br />¦ Section 13- Geochemical Data and Analysis; [HRMMR § 6.4.20(14)] <br />¦ Section 14- Construction Schedule; [HRMMR § 6.4.20(15)] <br />¦ Section 15- Construction Quality Assurance Quality Control Plan; [HRMMR § <br />6.4.20(16)] <br />1-3 <br />T:\84988-Denison Mines\Task Order 4 - EPP Sunday Mines GroupTINAL EPPTINAL - Environmental Protection Plan Sunday Mines.doc