Crusher Building and Wall <br />The crusher and crusher hopper sit on a concrete slab that is 31 feet by <br />35 feet. There is an expanded metal roof over the lower crusher area <br />which is 23 feet by 35 feet. <br />Maintenance Building <br />The maintenance shop has a slab on grade concrete foundation. The pad <br />next to the maintenance shop is 16 feet by 25 feet and also has a <br />concrete foundation. The maintenance shop is sheet metal construction <br />and the dimensions are shown on the attached graphic (as well as the <br />other structures). <br />Trailer No. 1 (Office) <br />The office trailer is 51 feet by 13 feet and is set on a concrete block <br />foundation. <br />Trailer No. 2 (Breakroom) <br />The breakroom is also 51 feet by 13 feet and is set on a concrete block <br />foundation. <br />• Movement of Reclamation Materials <br />The Division has asked how far waste rock and topsoil will have to be <br />moved to accomplish reclamation on the site. If the large waste rock pile <br />at the southern end of the mine were allowed to be moved now for use as <br />backfill the distance would vary from approximately 1,000 ft. to 3,000 ft. If <br />the waste was moved at the end of mining the distance would vary from <br />approximately 5,000 ft. to 7,000 ft. (this illustrates why it is more efficient <br />to move it now). <br />Topsoil stockpiles are present in a north-south alignment just east of the <br />mine. The distance to move the topsoil to areas to be reclaimed varies <br />from approximately 1,250 ft. to 2,500 ft. uniformly along the entire length <br />of the mine. <br />• Acid-Base Neutral ization/Remediation Report <br />This report was submitted to the Division in 1994 and a copy is attached to <br />this letter. <br />Cemex, Inc. - Dowe Flats Limestone Mine Page 4 <br />2009 TR-02