Laserfiche WebLink
Bowie No. 2 Mine C-1996-083 <br />rvm wi n <br />PROJECT IDENTIFICATION cvisiull IUD <br />Date : <br />User: 26-May-09 <br />JRS Permit C-1996-083 Site: Bowie No. 2 Mine <br />State : Colorado <br /> <br />A <br />e <br />N <br />C Filename: C083-330 County: Delta <br />g <br />ncy <br />ame: <br />olorado Division of Reclamation, Mining and Safety <br />Per <br />it A <br />ti <br />m <br />c <br />on: Minor Revision 105 <br /> <br /> <br />T <br />k T <br />k <br />as as <br />Description TASK HOURS DIRECT COST <br /> <br />331 Pl <br /> ug and Seal Gob Vent Borehole GVB-8-TG 8.00 $3 <br />280 <br />332 Regrade Drill Pad 9.58 , <br />$1 <br />990 <br />333 Replace Topsoil from Stockpile to Drill Pad 4.38 , <br />$909 <br />334 Reseed Drill Pad 2.10 $1 <br />437 <br /> , <br /> <br /> Direct Cost Total 24.06 $7 <br />616 <br /> , <br /> INDIRECT COSTS <br /> <br /> Overhead and Profit <br /> Liability Insurance (1.55% of Direct Costs) $118 <br /> Performance Bond (1.05% of Direct Costs) $80 <br /> Job Superintendent (at $42.25/hour) 12.03 $508 <br /> Profit (10.00% of Direct Costs) $762 <br /> <br /> <br /> Total Overhead and Profit $1,468 <br /> Contract Amount (Direct Costs + Overhead and Profit) $9,084 <br /> <br /> Legal - Engineering - Project Management <br /> Engineering Work and Contract/Bid Preparation (4.25% of Contract) $386 <br /> Reclamation Management and Administration (3.25% of Contract) $295 <br /> <br /> <br /> <br /> TOTAL BOND AMOUNT $9,765 <br />jrs Page 1 26-05-09