Laserfiche WebLink
Marathon <br />M Oil Company <br />May 18, 2009 <br />Ms. Mary Rodriquez <br />Division of Reclamation <br />Mining and Safety <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Re: 110c Annual Fee <br />Dear Ms. Rodriquez, <br />5555 San Felipe <br />Houston, TX 77056 <br />P. O. Box 3128 <br />Houston, TX 77253-3128 <br />Telephone 713-296-3546 <br />Please find enclosed a check for $323.00 for the Reclamation Permit. <br />Attached are displays for the quarry. The first attachment is the mine plan that <br />represents current status. Last year Marathon grubbed, and stripped topsoil from the <br />entire area. <br />As the quarry has not operated due to delay in receiving the air permit there have <br />been no significant changes. With the total area stripped, there will be no additional <br />disturbance planned in upcoming operations. <br />The only reclamation plans Marathon has will be seeding of the top soil stockpile and <br />weed prevention of the disturbed area. <br />Sincerely, <br />', J. Z " ----------- <br />Frank Krugh <br />Regulatory Compliance Manager