Laserfiche WebLink
The seed bed in all reclamation areas will be prepared by scarifying, tilling, harrowing, or <br />• roughening the surface of the replaced topsoil prior to seeding where needed to improve <br />revegetation potential. All disturbed areas will be reseeded with certified weed-free seed mixes. <br />The Rolling Loam areas will be reseeded with Native Seed Mix # 2, and the Pinyon-Juniper <br />Woodland areas will be reseeded with Native Seed Mix #3. The seed mixtures will be range <br />drilled or broadcast to achieve the application rate specified above. <br />After vegetation has been reestablished to pre-project levels and all disturbed areas have been <br />finally stabilized, any soil that has accumulated in the drainage system will be removed and <br />temporary BMPs, such as silt fences and straw bale check dams, will be removed. <br />.7 <br />• <br />54