My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REVISION - 5/22/2009, 8:32:50 AM-MR1
DRMS
>
Public
>
REVISION - 5/22/2009, 8:32:50 AM-MR1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:34:56 AM
Creation date
5/22/2009 8:42:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2008046
IBM Index Class Name
REVISION
Doc Date
5/21/2009
Doc Name
New MD application (MD-02) Non-confidential plan of development
From
American Shale Oil, LLC
To
DRMS
Type & Sequence
MD2
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• TOMOGRAPHY PAD (TM) <br />BH-1 (Exploration Borehole 1) (Figure 4-12) <br />• Drill 10 5/8" hole a minimum of 40 feet or until at least 5 feet of competent bedrock is <br />encountered. (Air or Air/Foam) <br />• Run 7 5/8", 26.4#, J-55 Surface Casing. <br />• Cement with "Neat Cement" to surface. <br />• Rig up diverter and wait on cement a minimum of 4 hours. <br />• Drill out thru the surface casing with 6 1/2" diameter PDC bit. Advance drill hole to <br />2400 feet and circulate a minimum of 30 minutes. <br />• Geophysical logging to be run without drill rig on the hole. Rig will return after logging <br />to Plug and Abandon the hole. <br />• Plug and abandon hole by mixing and pumping Type I or 11 Portland cement with 2% <br />bentonite via tremie in multiple lifts. Cement to surface. <br />0 <br />C? <br />31
The URL can be used to link to this page
Your browser does not support the video tag.