Laserfiche WebLink
Plan of Development <br />Index <br />Volume 1 <br />Page <br />Purpose ....................................................................................................... 5 <br />Introduction .................................................................................................. 6 <br />(The following content and order is taken from Section 8 of the AMSO Lease. Sections have been augmented <br />where appropriate to conform with: Oil Shale Management-General; Final Rules promulgated November 18, 2008) <br />(1) Names, addresses, and telephone numbers of those responsible for operations to <br />be conducted under the approved plan to whom notices and orders are to be delivered, <br />names and addresses of lessees, Federal lease serial numbers and names and addresses <br />of surface and mineral owners of record, if other than the United States; .......................... 9 <br />(2) A general description of geologic conditions and mineral resources, with <br />appropriate maps, within the area where mining is to be conducted; ................................ 10 <br />• (3) A copy of a suitable map or aerial photograph showing the topography, the area <br />covered by the lease, the name and location of major topographic and cultural features <br />and the drainage plan away from the affected area; ....................................................15 <br />(4) A statement of proposed methods of operating, including a description of the <br />surface or underground mining methods, the proposed roads, the size and location of <br />structures and facilities to be built, estimated recovery factors, stripping ratios (if applicable) <br />and number of acres in the Federal lease(s) or permit(s) to be affected; ........................... 17 <br />(4a) For in-situ operations - A statement of the proposed method of development that <br />includes: <br />a) A description detailing the in-situ methodology ...........................................17 <br />b) The equipment to be used in development and extraction ............................... 21 <br />c) The proposed access roads ....................................................................25 <br />d) The size, location and schematics of all structures and facilities to be built ........... 26 <br />e) The development sequence and schedule ...................................................27 <br />• f) The number of acres in the Federal lease(s) or permit(s) to be affected ................ 27 <br />2