Laserfiche WebLink
SiPCC !PLAN <br />3.0 PLAN APPROVAL AND CERTIFICATION 0 <br />I hereby approve the contents of the Spill Prevention, Control, and Countermeasures Plan (SPCC <br />Plan) for Phase I of AMSO's Oil Shale Research, Development, and Demonstration (RD&D) <br />Project and have the authority to commit the necessary resources to implement the SPCC Plan, as <br />set forth in this document, in accordance with the federal requirements of 40 CFR Part 112. <br />Signature: <br />Name: Roger L. Day <br />Title: Vice President of Operations <br />Date: <br />By means of this Professional Engineer Certification, I hereby attest, to the best of my knowledge <br />and belief, to the following: <br />• I am familiar with the requirements of 40 CFR Part 112 and have verified that this SPCC <br />Plan has been prepared in accordance with the requirements of this Part. <br />I or my agent have visited and examined the site. <br />• I have verified that this SPCC Plan has been prepared in accordance with good <br />engineering practice, including consideration of applicable industry standards. <br />I have verified that the required inspection and testing procedures have been established <br />as described in this document. <br />• I have verified that the SPCC Plan is adequate for this phase of the project. <br />(Seal) <br />Gregory Smith <br />Printed Name of Registered Professional Engineer <br />Signature of Registered Professional Engineer <br />Date: Registration No.: State: CO <br />American Shale Oil, LLC <br />5 <br />•