My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REVISION - 5/22/2009, 8:01:08 AM-MR1
DRMS
>
Public
>
REVISION - 5/22/2009, 8:01:08 AM-MR1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:34:56 AM
Creation date
5/22/2009 8:23:29 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2008046
IBM Index Class Name
REVISION
Doc Date
5/21/2009
Doc Name
New MD application (MD-02) Non-confidential Part 4
From
American Shale Oil, LLC
To
DRMS
Type & Sequence
MD2
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
131
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SIPCC 12LAN <br />1.0 INTRODUCTION • <br />American Shale Oil, LLC (AMSO) has prepared this Spill Prevention, Control, and Countermeasures <br />("SPCC") Plan in accordance with the Special Stipulations specified as part of HMSO's lease (Lease No. <br />COC 69169) with the U.S. Bureau of Land Management (BLM). The purpose of the plan is to reduce <br />the potential for adverse impacts associated with spills and leaks of oils dining implementation <br />of AMSO's Oil Shale Research, development, and demonstration (RD&D) Project. <br />AMSO will implement the RD&D Project using a phased approach, where the informat=ion <br />gathered dining each phase is used to guide subsequent phases. As such.,, this SPCC Plan will big <br />amended as necessary to address changes in operations during each phase of the project. Non-technical <br />amendments to the plan (e.g., phone number, contact names, or non-technical text changes) will not <br />require review and certified by a Professional Engineer. Technical amendments will be certified by a <br />Professional Engineer. <br />AMSO will be responsible for this SPCC Plan and will ensure that all personnel working on the site have <br />read this document and agree to follow its content by signing the signatory list provided in Appendix .A. <br />A copy of the plan will be kept readily available at the AMSO onsite office facility. <br />1.1 Plan Amendment <br />This SPCC plan shall be amended in accordance with the general requirements of 40 CFR 112.7, <br />and with any specific section of this part applicable to the facility, anytime there is a change in <br />facility design, construction, operation, or maintenance that materially affects the facility's <br />potential for a discharge as described in 40 CFR 112.1(b). An amendment trade under 40 CFR <br />112.5(a) must be prepared within six months, and irnplemented as soon as possible, but not later <br />than six months following the preparation of the amendment. <br />As required, any such amendments to this SPCC Plan will be noted on the Amendment I?og <br />included as Appendix A of this SPCC Plan. Entries into the log will indicate a general <br />description of the changes that were made to the facility, the corresponding changes that were <br />made to the SPCC Plan, including plan section and page numbers, and the name and signature of <br />• <br />American Shale Oil, LLC
The URL can be used to link to this page
Your browser does not support the video tag.