Laserfiche WebLink
THE INFORMATION ON THIS PAGE DOES NOT NEED TO BE HELD CONFIDENTIAL <br />Exhibit C - AMSO, LLC Notice of Intent Supplemental Information <br />• DETAILED DRILLING AND COMPLETION PLAN <br />DRILL PAD TP (TEST PAD) <br />CH-01 (See Figure CA ui this section) <br />Continuous Core and Hydrology Test Hole <br />+ Drill a 9 7/8" diameter hole a minumun of 20 feet with at least 5 feet into <br /> competent bedrock. Historically, surface casing holes have been 40 to 60 feet <br /> deep. (Air or Air/Foam) <br />• Run 7 5/8" Stu-face Casing. <br />• Cement with "Neat Cement" to surface. <br />• Rig tip diverter and wait on cement a minimum of 4 hours. <br />• Drill out thru the surface casing with 61/4" diameter PDC bit using air foam. <br /> Advance the drill hole to 1600 feet. <br />• Run 4 1/2", J-55 casing to bottom of the hole. This will be temporary casing and <br /> will be recovered after coring. <br />• • Set tip core drill <br />• Core with an HQ3 core set up from -600 feet to -2500 feet- Use a 10 ft. core <br /> barrel and mud circulation. <br />+ At Total Depth (-2500), circulate the hole clean and trip out of the hole. <br />• Demob the core rig and rig tip rotary drill. <br />+ Recover 4 '/2" casing <br />• Trip in the hole with a 6'14" PDC bit and open the hole to 2500' <br />• Circulate the hole clean and trip out of the hole <br />+ Run geophysical logs from TD to the bottom of the 7 5/8" casing. <br />+ Set any required mst7umentation and temporary packers. <br />• Rig down and de-mob <br />C, <br />12