My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REVISION - 5/22/2009, 7:55:28 AM-MR1
DRMS
>
Public
>
REVISION - 5/22/2009, 7:55:28 AM-MR1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:34:56 AM
Creation date
5/22/2009 8:23:05 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2008046
IBM Index Class Name
REVISION
Doc Date
5/21/2009
Doc Name
New MD application (MD-02) Non-confidential Part 1
From
American Shale Oil, LLC
To
DRMS
Type & Sequence
MD2
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MODIFICATION 03-2009 <br />Exhibit C - AMSO, LLC Notice of Intent Supplemental Information <br />The remaining Phase I wells will be constructed for the purposes specified in the <br />approved NOI. <br />DETAILED DRILLING AND COMPLETION PLAN <br />DRILL PAD TM <br />Exploration BH-1 (See Figure C.4-BHl in this section) <br />Drill 10 5/8" hole a miniunum.of 40 feet or until at least 5 feet of competent <br />bedrock is encountered. <br />Run 7 5f8", 26.4#, J-55 Surface Casing. <br />• Cement with "Neat Cement" to surface. <br />• Rig up diverter and wait on cement a minimum of 4 hours. <br />• Drill out tluu the surface casing with 6 1f2" diameter PDC bit. Advance drill hole <br />to -2400 feet and circulate a minimum of'30 minutes. Run geophysical logs. <br />• Plug and abandon hole by mining and pumping Type I or H Portland cement with <br />2% bentonite via tremie in multiple lifts. Cement to surface. <br />• <br />• <br />• <br />6
The URL can be used to link to this page
Your browser does not support the video tag.