Laserfiche WebLink
4 (Forni I - All idormation for DRMS use and confidential filing) <br />• 5. Describe proposed surface excavation or other land disturbance, including roads, pits, trenches, waste piles, drill pads and <br />collar areas of underground workings, ponds, etc... <br />PLEASE SEE ATTACHED MODIFICATION 03-2009 EXHIBIT C "SUPPLEMENTAL INFORMATION" <br />6. Proposed Disturbance (approximate) Describe the proposed drilling to be conducted, including anticipated number of holes, <br />diameter, depth. location, etc... Submit additional pages if necessary: <br />A. Drill Pads: Quantity Average Widtb _ 1.70 _(ft) Average 1.-ength __235...__(ft) <br />B. Drill Holes: Quantity 10 Depth 1180 to 2480 (ti) Diameter 4-314 to 19 (in) <br />C. Mud Pits: Quantity -I. - Average Width __40 <br />(k) =lveragc Length 300 (ft) <br />Average Depth 12 _ (ft) <br />Described proposed underground work, including reopening of old workings, advancement of adits or shafts, <br />trenches, pits, cuts, rock dumps, or other types of disturbance, describe type, quantity and general dimensions: <br />PLEASE SEE ATTACHED MODIFICATION 03-2009 EXHIBIT C "SUPPLEMENTAL INFORMATION" <br />• <br />D) Other Disturbance-, (please describe): <br />blt3_CHANGE... <br />E. Indicate Chetuicitls and Fuels used or stored on site, list type, quantity and metbod to store. <br />_NO CHAIN E I... <br />l=. 'fin Ito+r?lis): L F n"!th 1 ,1.75 6 Vidth 26 r IV! <br />Signt[ic:antI Upgraded Road(s) T..rn?tih tt1) Width ..r... 26 (ft) <br />Are ctrl- o t or other crossings proposed? it so, Please describe: One culvert installed on Test Pad access <br />r,oad..._I•LQ_additional culverts. to be installed <br />