My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-08-06_REVISION - C1981038
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981038
>
2007-08-06_REVISION - C1981038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:17:39 PM
Creation date
5/20/2009 1:57:59 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
REVISION
Doc Date
8/6/2007
Doc Name
Request for Assistance
From
Joe Dudash
To
Jim Stark
Type & Sequence
SL3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone. (303) 866-3567 <br />FAX: (303) 832-8106 <br />COLORADO <br />D IV IS I ON OF <br />RECLAMATION <br />MINING <br />SAFETY <br />DATE: August 6, 2007 <br />Bill Ritter, Jr. <br />Governor <br />TO: Jim Stark Harris D. Sherman <br />Executive Director <br />Ronald W. Cattany <br />FROM: Joe Dudash Division Director <br />Natural Resource Trustee <br />RE: Bowie No. 1 ine, C-1981-038, Bowie Resources LLC <br />SL-3, Partial Phase One Bond Release, Request for Assistance <br />I am requesting your assistance in the review of the Partial Phase One Bond Release (SL- <br />3) request, submitted by Bowie Resources LLC (BRL) for the Bowie No. 1 Mine. The <br />bond release request is for structural demolition and removal at the unit train loadout. The <br />reclamation work was performed during September through November 2006 and <br />involved the truck dump, concrete silos, the rail car loadout with associated structures <br />and the conveyors. BRL is requesting release of $1,200,000.00 of the required <br />reclamation liability of $5,756,607.00. The Division currently holds a reclamation bond <br />of $5,761,290.00 for the Bowie No. 1 Mine. <br />Attached is one copy of the SL-3 submittal and a three page itemized worksheet supplied <br />by the operator. If you need any additional information, please let me know. <br />I will call SL-3 complete on August 9, 2007. As you know, a site inspection is required <br />within 30 days of completeness, weather permitting. I would appreciate your response <br />back before the site inspection. If I could get your response back by August 31, 2007, that <br />would be most helpful. Thanks! <br />Attachments <br />cc: Sandy Brown (without attachments) <br />c:/word/bowie 1 /sl3memo 1 <br />Office of Office of <br />Mined Land Reclamation Denver • Grand )unction • Durango Active and Inactive Mines
The URL can be used to link to this page
Your browser does not support the video tag.