My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-01-08_REVISION - C1981038 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981038
>
2008-01-08_REVISION - C1981038 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:20:45 PM
Creation date
5/20/2009 1:57:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
REVISION
Doc Date
1/8/2008
Doc Name
3rd Adequacy Review Letter
From
DRMS
To
J.E. Stover & Associates
Type & Sequence
SL3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c . <br />Bowie No. 1 Mine C-81-038 <br />Partial Phase I Bond Release SL-03 <br />Applicable Cost Summary Sheet <br />Task: 000 Site: Bowie No. 1 Mine Date: 15 Nov 07 User: JRS <br /> <br />Permit Action: <br />Description:- <br />!Partial Phase I Bond Release SL-03 <br />- (Cost Summary <br />County ? <br />iFile Name: ---- <br />i Delta <br />1 C-1981-038 <br />Task I Reclamation Task Descriation Hours Direct Cost <br /> -- - 1- <br /> <br />201 Seal Loadout Wells i Not Released $0. <br />00 <br /> <br />202 <br />Demolish and Remove Structures at Loadout <br />_? <br />525.00 __ <br />_ <br />_ <br />$1,554,653.00 <br />203 'Combined with Task 202 1 0.00 $0.00 <br /> <br />204 <br />Haul Footprints of Loadout Stockpiles to Refuse Area <br />Not Released _ <br />$0.00 <br />205 Rip Coal Storage/Loadout Area Not Released $0 00 <br />206 _ --' Excavation/Grading at Storage Area and Loadout _ Not Released ; $0.00 <br />207 <br />208 Grade_Railro_ad Spur <br />--iFinish Grade Railroad Spur -- <br />Not Released- _ _$0.00 <br />Not Released $0.00 <br />209 Replace Topsoil from Stockpile to Truck Dump Station Not Released $0.00 <br />210 Reseed Train Loadout and Coal Stockpile Areas Not Released $0.00 <br />211 ;Remove Coal Stockpile Pond Not Released $0.00 <br />212 - rRemove Train Loadout Pond <br />-- Not Released __ <br />i $0.00 <br /> _ _ <br />r <br /> <br /> <br />----- - Total Indirect Costs <br />-r - -- - - $1,554,653.00 <br /> -- -- <br /> 'Liability Insurance (1.55%) $24,097 <br />.12 <br /> <br />- <br /> <br /> <br /> <br /> <br />-- - -- -- <br />Performance Bond (1.05%°) <br />Profit <br />( <br /> <br />- ------ ---- -- <br />Job Sup 10%) e in%) tendant 300 hours $37.50/hour <br />-- - - <br />-- --p ------ ----@ -- -- --) <br /> <br /> <br />i <br /> <br /> <br />525.00 _ <br />_ <br />_ <br />! $16,323.86 <br />$155,465.30 <br /> <br />$11,250.00 --- <br /> - <br />, - - - <br />- - <br />--- <br />- _ Total Contract - -L - $1,761,789.28 <br /> <br />- 'Engineering Fees (4.25%) $ <br />74,876.04 <br /> _ <br />Administrative Costs (3.25%) _ <br />$57,258.15 <br /> <br /> <br /> F <br /> <br />- <br /> <br />I <br />Total Applicable Loadout Liability I <br /> <br />= <br />i <br />i <br />$1,893,923.47 <br />Summary Sheet Page 1 of 1
The URL can be used to link to this page
Your browser does not support the video tag.