My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-01-08_REVISION - C1981038 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981038
>
2008-01-08_REVISION - C1981038 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:20:45 PM
Creation date
5/20/2009 1:57:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
REVISION
Doc Date
1/8/2008
Doc Name
3rd Adequacy Review Letter
From
DRMS
To
J.E. Stover & Associates
Type & Sequence
SL3
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie No. 1 Mine C-81-038 <br />Partial Phase I Bond Release SL-03 <br />Applicable Cost Summary Sheet <br />Task: 000 I Site: Bowie No. 1 Mine <br />Permit Action: - Partial Phase I Bond Release SL-03 <br />Description: Cost Summary - Date: 15 Nov 07 <br />_jCounty <br />File Name-_ j User: AS _ <br />!Delta _ <br />_ jC-1981-038 <br /> <br /> Task Reclamation Task Description _ Hours Direct Cost <br /> <br />201 _ <br />Seal Loadout Wells Not Released i $0.00 <br />202 __ <br />_ <br />I Demolish and Remove Structures at Loadout 500.00 - $1,721,161.00 <br />203 !,Demolish and Remove Structures at Loadout 200.00 $450,274.00 <br />204 _ :Haul Footprints of Loadout Stockpiles to Refuse Area Not Released _ <br />$0.00 _ <br />205 _ Rip Coal Storage/Loadout Area j Not Released $_0.00 <br />- <br /> <br />206 _ <br />j Excavation/Grading at Storage Area and Loadout _ <br />Not Released _ <br />_ <br />$0.00 <br /> <br />207 <br />!,Grade Railroad Spur <br />Not Released _ <br />$0.00 <br />208 _ Finish Grade Railroad Spur j Not Released $0.00 <br />209 <br /> <br />210 _ Replace Topsoil from Stockpile to Truck Dump Station <br /> <br />TReseed Train Loadout and Coal Stockpile Areas Not Released <br /> <br />Not Released $0.00 _ <br />-- --- <br />j $0.00 <br />211 -Remove Coal Stockpile Pond Not Released $0.00 <br />212 - - - <br />j Remove Train Loadout Pond Not Released $0.00 <br /> _- <br /> Total Indirect Costs $2,171,435.00 - <br /> i <br /> _-? Liability Insurance (1.55%) ! $33,657.24 _ <br /> Performance Bond (1.05%) $22,800.07 <br /> Profit (10%) ---- --- -- -- ----- - _ - _? _ $217,1_43.50 - <br /> I Job Superintendant (1500 hours @ $37.50/hour) 700.00 $56,250.00 <br />-- ------- - -- <br />Total Contract <br />j $2,501,285.81 <br /> <br /> Engineering Fees (_4.25% _ <br />_) r <br />j <br />$106,304.65 <br /> 'Administrative Costs (3.25%) - ---- - _ ---- ', -- --- -- --_i $81,291.79 -- <br /> <br /> <br /> <br /> ? I i <br /> <br /> I <br />--- --- - <br />i <br />i <br /> <br />i <br />i <br /> <br />I <br /> <br />Total Applicable Loadout Liability <br />- ------------- <br /> <br /> <br />i <br />' <br /> <br />i <br />----- ------- <br />-- <br /> <br /> <br /> <br /> <br />i <br /> <br /> <br /> <br />2,688,882.25 <br />Summary Sheet Page 1 of 1
The URL can be used to link to this page
Your browser does not support the video tag.