Laserfiche WebLink
f <br />1. S <br />Bowie No. 1 Mine C-81-038 <br />Partial Phase I Bond Release SL-03 <br />Total Loadout Reclamation <br />Task: 000 Site: Bowie No. 1 Mine !Date: 15 Nov 07 j User: J <br />RS <br />_ <br />,Partial Phase I Bond Release SL-03 <br />Permit Action: I County - <br />_ <br />Delta <br />Description: - <br />- -Cost Summary _ _ <br />IFile Name: IC-1981-038 <br />Task Reclamation Task Description } -Hours Direct Cost <br /> <br />201 'Seal Loadout Wells Not Released $0.00 <br />202 Demolish and Remove Structures at Loadout r 525.00 $1,554,653.00 <br /> <br />203 <br />_ !Combined with Task 202 <br />0.00 _ <br />$0.00 <br />204 '!Haul Footprints of Loadout Stockpiles to Refuse Area _ <br />Not Released $0.00 <br />--- <br />205 _ <br />_Rip Coal Storage/Loadout Area Not Released $0 <br />00 <br />_ _ . <br />206 _ ; Excavation/Grading at Storage Area and Loadout Not Released L <br />$0.00 <br /> <br />207 <br />208 <br />_ Grade Railroad Spur <br />Fi <br />i <br />h G <br />d <br />R <br />il <br />d S -- <br />_ <br />Not Released $0.00 _ <br />d- <br />-- 1 <br />n <br />s <br />ra <br />e <br />a <br />roa <br />pur Not Release $0.00 <br />209 _ !Replace Topsoil from Stockpile to Truck Dump Station __ Not Released $0.00 <br />210 Reseed Train Loadout and Coal Stockpile Areas Not Released $0.00 <br />211 _ j Remove Coal Stockpile Pond Ni of Released $0.00 <br />212 - 'Remove Train Loadout Pond - _-_-- Not Released $0.00 <br /> <br /> Total Indirect Costs -- - T $1,554,653.00 <br /> <br /> _-_---Liability Insurance (1.55%)- --- _- _ - --_--I --_ -L- $24,097.12 <br /> Performance Bond (1.05%) $16,323.86 <br />-- <br /> '!Profit (10%) r <br />$155,465.30 <br />- - Job Superintendant (300 hours @ $37.50/hour) -- 525.00 $11,250.00 <br /> <br /> <br />-- Total Contract <br />- ----- -- - <br />--- - - -- $1,761,789.28 <br /> <br />- -_??Engineering Fees (4.25%)- - --- --- - -__ - __ -I- _--$74,876.04 -- <br /> ;Administrative Costs (3.25%) _$57,258.15 <br /> -Total SL-3 A <br />licable Loadout Reclamati <br />n ? $1 <br />893 <br />923 <br />47 <br /> pp <br />o - -- - <br />, <br />, <br />. <br /> 160 % of Total SL-3 Applicable Loadout Reclamation $1,136,354.08 <br />Summary Sheet Page 1 of 1