My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-04-27_PERMIT FILE - C1996083A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2009-04-27_PERMIT FILE - C1996083A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:45:53 PM
Creation date
5/20/2009 11:18:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
4/27/2009
Doc Name
pg 2.05-59 to 2.05-126
Section_Exhibit Name
2.05 Operation and Reclamation Plans Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.05.6(6) <br /> <br />C <br />Subsidence Monitoring <br />Monument Location Frequency Purpose <br />Color aerial USDA-FS 5 Year intervals To monitor the topographic surface, <br />photographs Managed Surface beginning in 2001 soil and vegetation through <br /> until two years interpretation of color aerial <br /> after mining. photographs <br /> <br />Visual Known historic Twice per year, Determine if mining has rejuvenated <br /> and modern typically June and or created new landslides. <br /> landslides within November. <br /> the permit and <br /> adjacent area. <br /> <br />Visual Sheep Corral Within 3 months Monitor for surface fractures that may <br /> Drainage after the B-8 cause interruption of surface flows, <br /> bleeder entries damage stock ponds or create large <br /> are developed, fractures that will need to be mitigated. <br /> and on a quarterly <br /> basis thereafter <br /> during mining of <br /> panels B-8 and B- <br /> 9, and for six <br /> months post <br /> mining. <br /> <br />Panel B-11 eight At the edge of Quarterly and Separate confirmation of the angle of <br />monuments on panel B-11 more frequently draw close to the Bruce Park Dam. <br />one line to capture the <br />an le of draw. <br /> <br />All other Over mining area At the discretion To develop subsidence data to <br />monuments of the Operator support future mine plan expansions. <br />PR-11 <br />2.05 - 126 - <br />11 /08 <br />IZ~)q/a 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.