My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-04-27_PERMIT FILE - C1996083A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2009-04-27_PERMIT FILE - C1996083A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:45:53 PM
Creation date
5/20/2009 11:18:14 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
4/27/2009
Doc Name
pg 2.05-59 to 2.05-126
Section_Exhibit Name
2.05 Operation and Reclamation Plans Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.05.6 <br />(3)(b)(iv) <br />M R-56 <br />/i PPROV~I <br />S~16~o5 <br />Hydrologic Monitoring Plan <br />The following monitoring plan is designed to provide data which will verifythe <br />Bowie No. 2 Mine will not have significant adverse impacts on the surface or <br />subsurface water which is within or adjacent to the permit area. The <br />hydrologic monitoring locations, shown on Map 9 are: <br />Springs will be monitored quarterly. Depending on weather conditions, the <br />first quarter monitoring event may be delayed until April or May. Field <br />parameters will be measured each quarter and a full suite sample will be <br />obtained each quarter from all springs which have a flow of five gallons per <br />minute or more. Spring monitoring will include water right map codes 1 <br />through 5 which are decreed water rights described as J & M Spring & PL <br />No. 1 - 5. J & M Spring & PL No. 1 - 4 are on the Applicants land and are <br />owned by the Applicant. <br />Stock Ponds will be monitored quarterly. Depending on weatherconditions, <br />the first quarter monitoring event may be delayed until April or May. The <br />following information will be collected forthe ponds; 1) inflow; 2) outflow; and <br />3) water level below spillway outlet or depth of water in pond measured from <br />the bottom of the pond. <br />The following fourteen drill holes will be monitored: DH-15, DH-25, DH-38, <br />DH-39, DH-49, DH-65, DH-67B, DH-67D, DH-67Abv, DH-67BIw, TC-03- <br />01(B), TC-03-01(R), TC-03-02, TC-03-03. Depending on weather conditions, <br />the first quarter monitoring event may be delayed until April or May. Field <br />parameters will be measured each quarter. A full suite sample will be <br />obtained semi-annually during the second and fourth quarters. <br />The Deer Traii Ditch will be monitored at the designated upstream and <br />downstream monitoring locations (designated "DTD" on Map 9). Field <br />parameters will be measured each quarter. A full suite sample from List 1 <br />will be obtained semi-annually during the second and fourth quarters. During <br />August of each year a sample will be obtained and analyzed for the <br />parameters on List 2. <br />2.05 - 76 04/05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.