s <br />2008 Reclamation Relo rt <br />Southfield Aline <br />Energy Fuels Coal, Inc. <br />Southfield Mine <br />2008 ANNUAL RECLAMATION REPORT <br />Introduction <br />This Annual Reclamation Report documents all final reclamation and site maintenance activities <br />conducted by Energy Fuels Coal, Inc (EFCI) at the Southfield Mine and associated Loadout during <br />the 2008 calendar year. Included with this report are text, discussion, and maps, in accordance with <br />the requirements of Rule 2.04.13. In addition, the Division's Annual Reclamation Report form is <br />completed and attached hereto. <br />EFCI ceased coal mining and processing activities in late December 2000. EFCI subsequently filed <br />for permanent cessation of operations, and commenced final reclamation of the site during August <br />2001. <br />At the end of 2003 a total of approximately 82.1 acres, of the total disturbed area of 105.8 acres, had <br />been backfilled, graded, topsoiled, and stabilized with permanent seeding and mulching. This total <br />reclaimed acreage included approximately 14 acres previously (1997) reclaimed in the Loadout area <br />and approximately 68.6 acres reclaimed during 2001-2003 in the Mine Site Area. The 23.7 of <br />disturbed area that remain include roads, facilities, sediment control structures, and soil stockpiles, <br />of which approximately 15.3 acres are long-term facilities that have been approved for permanent <br />retention in conjunction with the approved postmining land use. The remaining disturbed areas <br />comprising 8.4 acres are associated with temporary facilities that will remain in place for some <br />portion of the reclamation liability period to provide ongoing access and sediment control. <br />Interseeding of approximately six (6) acres within the Corley property in the Mine Facilities Area <br />was completed in October 2004. The interseeding was done in response to violation #CV-2004-003, <br />issued by the DMG, citing EFCI for mistakenly not seeding the appropriate `revised' seed mixture <br />as approved. A detailed description of the interseeding is provided in Seeded or Planted Areas, <br />below. <br />As part of EFCI's regular site maintenance activities and in conformance with any concerns noted <br />by the DRMS in their regular site inspections, surface water control structures and roads were <br />inspected. Based on inspection, the surface water control structures and roads were in generally <br />good condition, the only required repairs or maintenance as noted below. In conjunction with final <br />site reclamation and ongoing site maintenance, EFCI completed the following specific activities: <br />Graded mine site entrance road from Pond 5 to the gate adjacent to the old Vento office building; <br />Graded road around refuse pile along south side of pile & portions of the north side; <br />Reshaped `bar trenches' across road to direct sheet flow to road ditch near intersect of CR92 & <br />refuse pile road;