Laserfiche WebLink
New Elk Mine <br />4/7/2009 <br />EMERGENCY SPILLWAY <br />1). Does it appear that the emergency spillway has discharged water since the last inspection? Yes LIZ- <br />2). Is erosion occurring at any section of the emergency spillway? No <br />Yes <br />Describe extent: <br />SEDIMENT STORAGE CAPACITY <br />1). Has the design storage capacity of the reservoir been surpassed? No <br />Yes _ No <br /> <br />OTHER OBSERVATIONS <br />PAO', ff <br />MSHA Qualified impoundment 1 spector <br />Date <br />Pago 2 of 2