My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-05-12_PERMIT FILE - C1980005 (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980005
>
2009-05-12_PERMIT FILE - C1980005 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:46:24 PM
Creation date
5/19/2009 12:40:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
Permit File
Doc Date
5/12/2009
Section_Exhibit Name
Tab 12 Operation Plan
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"Pipe Flow Charts" in EIDS-3. • <br />4.03.2(5) Surfacirw. See E~dribit 7-14 for typical detail. <br />4.03.2(6) Maintenance. Access roads will be ir~Gnor-r~i on a daily work <br />basis at the Seneca II Mire. If, upon inspection, it is <br />determined that repairs are needed, appropriate repairs such <br />as, lxrt not limited to, bladirxl, filling of potholes, <br />replacement of the road surfaces, revegetation of side slopes <br />and waterirg for dust control, will be corrltrcted as reoessary. <br />4.03.2(7) Restoration. Unless Peabody requests retention of access <br />roa ds for mstm;n;r~ land use and the Division approves such <br />req uest, ;~;ately after the road is no longer needed for <br />operations, reclamation, or monitoring: <br />a. The road will be closed to vehicular traffic; <br />b. The natural~lrainage patterns will be restored; <br />c. All bridges aryl culverts will be removed; • <br />d. Roadbeds will be ripped, placed and scarified; <br />e. Fill slopes will be rounded or reduced aryl shaped to <br /> COT1f0LID the site tO ddjacent tors in BI7d tO meet <br /> natural-drainage restoration crar,Aarr9a; <br />f. Cart slopes will be shaped to blend with the natural <br /> oorrtau~s; <br />g. Terraces will be constructed as necessary to prevent <br /> exoPSSive erosion and to provide long-term stability in <br /> cut-aryl-fill slopes; <br />h. The regraded area will be covered with topsoil in <br /> accordance with the approved reclamation plan; <br />i. Unless otherwise authorized by the Division, all <br /> road-slsfacing materials will be removed, hauled or <br /> conveyed and disposed artier 4.11.4. <br />4.03.2 ISC3iiLUSE ROAD. <br />At the Seneca II Mine, there are currently no plans to • <br />construct additional light-use roads. <br />12-37j Revised 12/10/92 <br />
The URL can be used to link to this page
Your browser does not support the video tag.