My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-05-12_PERMIT FILE - C1980005 (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1980005
>
2009-05-12_PERMIT FILE - C1980005 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:46:24 PM
Creation date
5/19/2009 12:40:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980005
IBM Index Class Name
Permit File
Doc Date
5/12/2009
Section_Exhibit Name
Tab 12 Operation Plan
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
state Rea. <br />rw~aff) x (slope adjustsent i`actor) x (Porrling Factor) x <br />(watershed shape adjustment factor) = Q10cfs. <br />11. Determine culvert size by using Quart 5 for roarrd <br />corrugated metal pipes with projecting entrances frcan the <br />Federal Highway AdminiGtration's "Hydraulic FY~gineering <br />C;rr~,lar No. 5." The culvert diameter is determined fr'CIIn <br />the ncmngraph aft.P.r' knaaing What the di c~-harr~e is aIYl the <br />ratio of allowable headwater to culvert diameter is for a <br />projecting headwall-type entrance. <br />12. Suitable protection against erosion or fill saturation <br />will be provided at the entrance where headwater is <br />anticipated. <br />13. Peabody requests a variance frrnn the QII12B Arles aryl <br />Regulations, Section 4.03.1(4)(e)vi, requirirq the <br />spacing of culverts at specified intervals. With the <br />topography, site conditions, and precipitation rates at <br />the Seneca II Mine site, Peabody's experience has been <br />that with properly desic~ed, installed, and maiTrhainad <br />culverts, excessive erosion will be controlled as well as <br />or better than goir-g to multiple culvert spacir-g which <br />will create more drainage channels aryl rmrltiply any <br />erosion potential. <br />14. See Table 12-6 for a list of culvert specifications. <br />15. See Appendix 12-2 for culvert sizing calculations. <br />16. Zhe design of all new culverts proposed to be wnstructed <br />during the next five year permit term will be designed to <br />safely pass the peak runoff from the 10-year, 24-hour <br />storm event. The peak flows will be determined using the <br />SIDIMOT II Co¢[g~utes Program. Proposed culvert <br />specifications and cxurtputer printouts aooor~any this <br />application in Table 12-6 and Appendix 12-2. F7diibit 7-7 <br />depicts culvert locations. <br />4.03.1(6) Maintenance. Haul roads are inspected on a daily basis at <br />the Seneca II Mine. If upon inspection it is determined that <br />n <br />L_J <br />• <br />• <br />12-35 Revised 10/02/89 <br />
The URL can be used to link to this page
Your browser does not support the video tag.