Laserfiche WebLink
Bowie No. 2 Mine C-1996-083 <br />Terhniral Revision 63 <br />PROJECT IDENTIFICATION <br />Date : 19-May-09 Permit C-1996-083 Site: Bowie No. 2 M ine <br />User: JRS State : Colorado <br /> Filename: C083-300 County: Delta <br />Agency Name: Colorado Division of Reclamation, Mining and Safety <br />Permit Action: Technical Revision 63 <br /> <br />Task Task Description TASK HOURS DIRECT COST <br /> <br />263 Regrade Light-Use Road -7.37 -$1,529 <br />265 Replace Topsoil from Stockpile Light-Use Road -1.80 -$373 <br />267 Reseed Light-Use Road -0.90 -$616 <br /> <br /> Direct Cost Total -10.07 -$2,518 <br /> <br /> INDIRECT COSTS <br /> <br /> Overhead and Profit <br /> Liability Insurance (1.55% of Direct Costs) -$39 <br /> Performance Bond (1.05% of Direct Costs) -$26 <br /> Job Superintendent (at $41.25/hour) -5.04 -$208 <br /> Profit (10.00% of Direct Costs) -$252 <br /> <br /> <br /> Total Overhead and Profit -$525 <br /> <br /> Contract Amount (Direct Costs + Overhead and Profit) -$3,043 <br /> <br /> <br /> Legal Engineerin-PPJect Mana eg ment <br /> Engineering Work and Contract/Bid Preparation (4.25% of Contract) -$129 <br /> Reclamation Management and Administration (3.25% of Contract) -$99 <br /> <br /> <br /> <br /> <br /> <br /> TOTAL BOND AMOUNT -$3,271 <br />jrs Page 1 19-05-09