New Fish Creek Borehole Discharge Pipeline (MR09-237) <br />A new pipeline and head gate was installed at the Fish Creek Borehole (FCBH) treatment pond <br />that controls discharge through CDRMS site 115 to Fish Creek. This pipeline would replace an <br />existing discharge pipeline that appears to be subject to clogging. Construction is anticipated to <br />take place during the upcoming Longwall move in May 2009, during which period water from the <br />treatment pond is not required underground, thus TCC will drain the pond to allow construction. <br />The pipeline will consist of a 12" PVC sewer line extending approximately 50 from the treatment <br />pond to the 115 drainage channel. The location of the line is shown on Map 24 (sheet 2 of 3). <br />2.05-50.1 ? Check with Jerry