My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-05-15_REVISION - C1982056
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1982056
>
2009-05-15_REVISION - C1982056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:46:35 PM
Creation date
5/18/2009 12:24:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
REVISION
Doc Date
5/15/2009
Doc Name
Letter & Application (Emailed)
From
Twentymile Coal Company
To
DRMS
Type & Sequence
MR237
Email Name
JHB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
'Peabod4 <br />L-MMM, <br />Twentymile Coal Company 29515 Routt County Road #27 <br />Oak Creek, CO 80467 <br />970.879.3800 <br />May 13, 2009 <br />?ECE1VE® <br />MAC( `? 5 2009 <br />Mrs. Janet Binns <br />Environmental Protection Specialist ulyk",A'U1 ?nagaety n, <br />and <br />Colorado Division of Minerals and Geology Mining <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />(303) 866-3567 X 8107 <br />RE: Twentymile Coal Company - Foidel Creek Mine (Permit No. C-82-056), Minor Revision <br />(MR09-237) for New Discharge Pipeline & Headgate at Fish Creek Borehole Treatment Pond, and <br />New Drainage Culvert on Pond B Access Road. <br />Dear Mrs. Binns: <br />Twentymile Coal Company (TCC) requests CDRMS approval of a Minor Revision <br />(MR09-237) to the approved Permit, for installation of new discharge pipeline and <br />headgate at the Fish Creek Borehole (FCBH) treatment pond that controls discharge <br />through CDRMS site 115 to Fish Creek. This pipeline would replace an existing <br />discharge pipeline that appears to be subject to clogging. Construction is anticipated <br />to take place during the upcoming Longwall move in May, during which period water <br />from the treatment pond is not required underground. Thus TCC will drain the pond <br />to allow construction. The pipeline will consist of a 12" PVC sewer line extending <br />approximately 50 from the treatment to the 115 drainage channel. <br />TCC also requests approval for the installation of an 18" culvert, extending from a <br />drainage sump constructed along bottom of the Pond B access road, to an existing <br />collection basin located immediately south of the access road. The Pond B access road <br />had been an on-going concern during wet periods when runoff erosion could discharge <br />fines into a vegetative area along Foidel Creek. A soil berm located between the access <br />road and Foidel Creek will prevent future discharge into the creek. A sump and <br />culvert located at the base of the road will direct runoff into the existing collection <br />basin that eventually drains to Pond B. <br />The proposed FCBH pipeline and Pond B sump and culvert are shown on Map 24 (Map <br />2 of 3, and 1 of 3, respectively). All other minor revision documents are enclosed. <br />CADocuments and Settings\jhb\Local Settings\Temporary Internet Files\Content.Outlook\F7H3ZTK7\MR09-237 FCBH <br />Discharge Line Pond B access road culvert CL.doc\FCBH Discharge Line & Pond B access road culvert CL.doc
The URL can be used to link to this page
Your browser does not support the video tag.