Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />PROJECT IDENTIFICATION <br />Task # <br />Date <br />User <br />Agency or organization name : Colorado Department Of Reclamation, Mining And Safety <br />003 State : Colorado Permit/job # : M1983102 <br />0511112009 County:Grand Abbreviation :none <br />PSH. Site :Thompson Resource Filename :M102-003 <br />Permit or other job action : So-02 Revised Bond Calculation <br />Task description :Replace Topsoil <br />HOURLY EQUIPMENT COST <br />uipment Description <br />Cost BrE <br />Shift basis : 1 per day <br />Scraper work team -Scraper :Cat 631 G <br />-Push dozer : Cat D9R - 9SU (2005) <br />Support equipment -Load area :INA <br />-Dump area : NA <br />Road maintenance -Motor grader : NA <br />-Water truck :INA <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 dozer NA NA NA NA <br />% Utilization-machine : 86 100 NA NA NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownerhip cost/hour : $78.78 $62.35 NA NA NA NA <br />Operating cost/hour : $107.60 $103.27 NA NA NA NA <br />Ripper op. cost/hour : NA $0.00 NA NA NA NA <br />Operator cost/hour : $24.95 $32.78 NA NA NA NA <br />Unit subtotals : $211.33 $198.40 NA NA NA NA <br />Number of units : 2 1 0 0 0 0 <br />Group subtotals : Work : $621.07 Support : $0.00 Maintenance : $0.00 <br />Total work team cost/hour : $621.07 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 11,688 CCY factor : 1.115 volume : 13,032 LCY <br />Source of quantity take-off :AM-02 Estimate <br />Source of estimated swell factor : Cat Handbook