My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-05-13_REVISION - M1983102
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983102
>
2009-05-13_REVISION - M1983102
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:44:24 AM
Creation date
5/15/2009 7:52:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983102
IBM Index Class Name
REVISION
Doc Date
5/13/2009
Doc Name
FW increase
From
DRMS
To
Reclamation Ridge, LLC
Type & Sequence
SI2
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sheet 1 of 2 <br /> CIRCES Cost Estimating Software <br /> TRUCK/LOADER TEAM WORK <br />PROJECT IDENTIFICATION , <br />Agency or organization name : Colorado Department Of Reclamation, Mining And Safety <br />Task 009 State : Colorado Permit/job # : M1983102 <br />Date : 0511112009 County : Grand Abbreviation :none <br />User: PSH Site : Thompson Resource Filename : M102-009 <br />Permit or other job action : SO-02 Revised Bond Calculation <br />Task description : Truck Concrete/Asphalt/Equip Debris Off-site <br />HOURLY EQUIPMENT COST Shift basis : 1 per day <br />Equipment Description <br />Truck/loader team -Truck l Generic 8-10 cy, 6x4 <br />-L oader :iCAT 938G (2003) <br />Support equipment -Load area :INA <br />-Dump area : NA <br />Road maintenance -Motor grader <br />-Water truck <br />Cost Breakdown : Truck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Area Dump Area Road Maintenance.Equipment <br />Motor Grader Water Truck <br />Import data filename : truck2 loader NA NA NA NA <br />% Utilization-machine : 90 100 NA NA NA NA <br />-Ripper attachment : NA NA NA NA NA NA <br />Ownership cost/hour : $9.32 $16.13 NA NA NA NA <br />Operating cost/hour : $31.64 $26.21 NA NA NA NA <br />Ripper op. cost/hour : NA NA NA NA NA NA <br />Operator cost/hour : $21.72 $32.78 NA NA NA NA <br />Unit subtotals : $62.68 $75.11 NA NA NA NA <br />Number of units : 4 1 0 0 0 0 <br />Group subtotals : Work : $325.83 Support : $0.00 Maintenance : $0.00 <br />Total work team cost/hour : $325.83 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 5,000 LCY factor : NA volume : 5,000 LCY <br />Source of quantity take-off : DRMS <br />Source of estimated swell factor : NA <br />Material purchase cost : $0.00 /LCY Total cost : $0 <br />HOURLY PRODUCTION <br />Truck Capacity : <br />Truck Payload (weight) Basis : Truck Bed (volume) Basis <br />Material weight : 3,300 pounds/LCY Struck volume <br />Descr. : DeCOMDosed rock - 75% Rock, 25% Earth Heaped volume <br />Rated payload <br />Payload capacity <br />27,280 pounds Average volume <br />8.27 LCY Adjusted volume* <br />Final truck volume based on number of loader passes <br />'truck volume adjusted to not exceed rated payload or heaped volume <br />Loading Tool Capacity : Job Condition Corrections <br />Rated capacity (nom. heaped) : 3.250 LCY Truck <br />Descr.:Loose material - 1"and over (85 - 9096) Altitude adj, : 0.970 <br />Bucket fill factor : 0.875 <br />Adjusted bucket capacity : 2.844 LCY Job efficiency : <br />Net correction : 0.830 <br />0.805 <br />8.00 <br />10.00 <br />9.00 <br />8.27 <br />5.69 <br />LCY <br />LCY <br />LCY <br />LCY <br />LCY <br />Site altitude (ft.) : 8,000 <br />Loader Source <br />1.000 (Cat HB) <br />0.830 (1 shift/day) <br />0.830 <br />
The URL can be used to link to this page
Your browser does not support the video tag.