My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-05-11_INSPECTION - M1990025
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1990025
>
2009-05-11_INSPECTION - M1990025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:46:21 PM
Creation date
5/15/2009 7:51:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1990025
IBM Index Class Name
INSPECTION
Doc Date
5/11/2009
Doc Name
Inspection report
From
DRMS
To
Four States Aggregates
Inspection Date
4/10/2009
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
sheet 1 of 2 <br />PROJECT IDENTIFICATION <br />Agency or or( <br />Task # : 004 <br />Date : 0511112009 <br />User : WHE <br />Task description :Topsoil replacement 1' deep over 17.7 acres <br />HOURLY EQUIPMENT COST <br />Shift basis <br />(Equipment Description <br />CIRCES Cost Estimating Software <br />SCRAPER TEAM WORK <br />lanization name :DRMS <br />State :Colorado Permit/job # : M-1990-025 <br />County :Montezuma Abbreviation :none <br />Site :Hay Camp Pit Filename :M025-004 <br />Permit or other job action : Sr-01 <br />Scraper work team -Scraper : Cat 633E Series 2 (2001) <br />-Push dozer:NA <br />Support equipment -Load area :Cat D8R Series 11- 8SU (2005) <br />-Dump area :NA <br />Cost Bre <br />Road maintenance -Motor grader : NA <br />-Water truck : NA <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA dozer NA NA NA <br />% Utilization-machine : 100 NA 100 NA NA NA <br />-Ripper attachment : NA NA 0 NA NA NA <br />Ownerhip cost/hour : $80.67 NA $50.32 NA NA NA <br />Operating cost/hour : $117.98 NA $77.13 NA NA NA <br />Ripper op. cost/hour : NA NA $0.00 NA NA NA <br />Operator cost/hour : $24.95 NA $32.78 NA NA NA <br />Unit subtotals : $223.59 NA $160.22 NA NA NA <br />Number of units : 2 0 1 0 0 0 <br />Group subtotals : Work : $447.18 Support: $160.22 Maintenance : $0.00 <br />Total work team cost/hour : $607.40 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 28,556 LCY factor : NA volume : 28,556 LCY <br />Source of quantity take-off : (17.7ac)(43560sf/ac)(1'D)/27 = 28,556 cy <br />Source of estimated swell factor : NA <br />1 per day
The URL can be used to link to this page
Your browser does not support the video tag.