Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estimating Software <br />SCRAPER TFEAM WORK <br />PROJECT IDENTIFICATION <br />Agency or organization name: DRMS <br />Task #: 003 State : Colorado <br />Date : 0511112009 County :Montezuma <br />User : WHE Site :Hay Camp Pit <br />Permit or other job action : Sr-01 <br />Task description :Replace OVB 1.5' depth over 16 acres <br />HOURLY EQUIPMENT COST <br />Shift basis : 1 per day <br />(Equipment Description <br />Scraper work team -Scraper :Cat 633E Series 2 (2001) <br />-Push dozer:NA <br />Cost Bre <br />Support equipment -Load area : Cat D8R Series 11 - 8SU (2005) <br />-Dump area :NA <br />Road maintenance -Motor grader :NA <br />-Water truck : NA <br />akdown : Scraper Work Team <br />Scraper Dozer Support Equipment <br />Load area Dump area Road Maintenance Equipment <br />Grader Water truck <br />Import data filename : scraper2 NA dozer NA NA NA <br />% Utilization-machine : 100 NA 100 NA NA NA <br />-Ripper attachment : NA NA 0 NA NA NA <br />Ownerhip cost/hour : $80.67 NA $50.32 NA NA NA <br />Operating cost/hour : $117.98 NA $77.13 NA NA NA <br />Ripper op. cost/hour : NA NA $0.00 NA NA NA <br />Operator cost/hour : $24.95 NA $32.78 NA NA NA <br />Unit subtotals : $223.59 NA $160.22 NA NA NA <br />Number of units : 2 0 1 0 0 0 <br />Group subtotals : Work : $447.18 Support : $160.22 Maintenance : $0.00 <br />MATERIAL QUANTITIES <br />Initial <br />volume : 38,720 LCY <br />Total work team cost/hour : <br />Swell Loose <br />factor : NA volume <br />38,720 LCY <br />Source of quantity take-off :(16ac)(43560sf/ac)(1.5'D)/27 = 38,720 cy <br />Source of estimated swell factor :NA <br />Permit/job #: M-1990-025 <br />Abbreviation :none <br />Filename : M025-003 <br />$607.40