Laserfiche WebLink
Table 1- Post-SMCRA Bond Release History - Edna Mine C-1980-001 <br /> Amounts Released by Phase <br />Bond <br />Release Decision Date Amount Released Revised Bond Bond aLocation I 11 III Comment <br /> Required Phase Released <br />Number <br />Liability 5/1986 <br />$0.00 <br />$7,171,716.00 Center Ridge: Secs. 13 <br />$0.00 Liability Release Only <br />1,11,111 6 <br />Release (Estimated) & 24,4N-86W <br /> West Ridge 581.5 <br />SL-2 9/18/1997 $821,613.00 $6.,350,103.00 1 597.1 acres and Center $821,613.00 <br /> Ridge 15.6 acres <br />SL-3 <br />SL-4 10/26/1998 $1,307,927.00 $5,042,176.00 1 <br />SL-5 10/12/1999 $24,039.00 $5,018,137.00 11,111 <br /> $50,520.00 $4,967,617.00 1,11,111 <br />SL-6 12/9/1999 $663,590.00 $4,304,027.00 1,11,111 <br />SL-7 1/5/2000 $464,143.00 $3,839,884.00 1 <br />SL-8 2/13/2004 $440,237.00 $3,071,961.00 1,11,111 <br />$327,686.00 <br />SL-9 6/1/2005 $226,163.00 $2,845,798.00 1,11,111 <br />342.5 Moffat area: Secs 31, $1,307,927.00 <br /> 7,36 <br /> Interim law lands: <br />53.1 Secs. 13, 18, 19, and $5,303.00 $18,736.00 <br /> 24-4N-86W <br />10.5 South of Shop $30,312.00 $12,630.00 $7,578.00 <br />13.5 Upper facilities area $398,154.00 $165,898.00 $99,538.00 <br />258 Support facilities, $464,143.00 <br /> roads, etc. <br />10 Hillslope conveyor, $264,142.00 $110,059.00 $66,036.00 <br /> Goat Trail road <br /> Facilities removal only <br />3.3 in gravel pad/Oak $327,686.00 <br /> Creek entrance <br />3.3 Gravel pad and road $135,698.00 $56,541.00 $33,924.00 <br /> Subtotal $3,749,675.00 $350,431.00 $225,812.00 <br />Withdrawn to collect <br />additional year of veg. <br />data <br />Total Released $4,325,918.00