My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-05-13_REVISION - C1980001
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980001
>
2009-05-13_REVISION - C1980001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:46:28 PM
Creation date
5/14/2009 10:03:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980001
IBM Index Class Name
REVISION
Doc Date
5/13/2009
Doc Name
Midterm Review Findings Document
From
DRMS
To
Chevron Mining, Inc
Type & Sequence
MT6
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Midterm Review <br />Edna Mine <br />C-1980-001 <br />This document presents the results of the Midterm Permit Review of the Chevron Mining, Inc.'s <br />Edna Mine. The Colorado Division of Reclamation, Mining and Safety (Division) conducted <br />this review for the purpose of fulfilling the requirements of the Colorado Surface Coal Mining <br />Reclamation Act and the Regulations of the Colorado Mined Land Reclamation Board for Coal <br />Mining. <br />This Midterm Review was conducted to fulfill the requirements of Sections 2.08.3, 2.06.2(10), <br />2.06.3(4)(a), 2.06.5(3), 2.06.7(5) and 3.02.2(4). <br />Section 2.08.3 of the Regulations requires that the Division conduct a review of each permit <br />issued, prior to its midterm. Based on this review, for good cause shown, the Division may <br />require reasonable revisions or modifications of the permit provisions to ensure compliance with <br />the Act and Regulation. <br />Section 3.02.2(4) requires that the Division review the amount of the bond and the terms of <br />acceptance of the bond every 2 '/2 years. <br />Sections 2.06.2(10), 2.06.3(4)(a), 2.06.5(3) and 2.06.7(5) require that experimental practices, <br />mountaintop removal variances, variances from approximate original contour (AOC) and <br />variances from contemporaneous reclamation, respectively, be reviewed by the Division where <br />applicable during the Midterm Review. These sections are not applicable at the Edna Mine, as <br />no such practices or variances have been approved at the Edna Mine. <br />This Midterm Review consisted of a detailed review of the following document: <br />• The Edna mine permit application, including stipulations and responses <br />• All revisions made to the permit since the last permit renewal (RN-5) <br />• The Edna Mine annual reclamation and hydrology reports <br />• Bond surety and reclamation cost estimate <br />• The Division findings documents and previous Midterm Reviews <br />• The Divisions inspection reports <br />• Any notices of violations since the last permit renewal (RN-5) <br />Edna Mine -2- 4/15/2009
The URL can be used to link to this page
Your browser does not support the video tag.