My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-05-13_REVISION - C1980001
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980001
>
2009-05-13_REVISION - C1980001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:46:28 PM
Creation date
5/14/2009 10:03:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980001
IBM Index Class Name
REVISION
Doc Date
5/13/2009
Doc Name
Midterm Review Findings Document
From
DRMS
To
Chevron Mining, Inc
Type & Sequence
MT6
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/houdunit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br /> <br /> <br />-Truck Tractor, 6x4, 50K GVW $68.44 1 $68.44 $68.44 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $68.44 $68.44 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Hayden <br />Transportation Cycle Time : Non- Total one-way travel distance : 26.0 miles <br /> Roadable Roadable Average travel speed : 45.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 0.58 0.58 Total non-roadable mob/demob cost' : $4,018.16 <br />Return time (hours) = 0.58 0.58 ` two round trips with haul rig <br />Loading time (hours) = a50 NA Total roadable mob/demob cost $79.08 <br />Unloading time (hours) = 0.50 NA •• one round trip, no haul rig <br />Subtotals = 2.16 1.16 <br /> <br />JOB TIME AND COST Total job time : 4.31 hours <br /> Total job cost : $4,097
The URL can be used to link to this page
Your browser does not support the video tag.