My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-05-13_GENERAL DOCUMENTS - C1980001
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1980001
>
2009-05-13_GENERAL DOCUMENTS - C1980001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:46:27 PM
Creation date
5/14/2009 10:00:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980001
IBM Index Class Name
General Documents
Doc Date
5/13/2009
Doc Name
Midterm Review Findings Document
Permit Index Doc Type
Findings
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatinc i Software <br /> WHEEL LOADER - LOAD AND CARRY WORK <br />PROJECT IDENTIFICATION <br />Task #: 032 State : Colorado Permit/job #: C-1980-001 <br />Date : 0313112009 County : Routt Abbreviation :none <br />User : JDM Site : Edna Mine Filename : 0001-032 <br />Agency or organization name : Colorado Division of Reclamation, Mining And Safety <br />Permit or other job action : Midterm Review 2009 <br />Task description : Replace Topsoil at Oak Creek Office Site <br />HOURLY EQUIPMENT COST Basic machine : CAT 914G Horsepower : 90 <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Data source : (CR(3) <br />Utilization % <br />Cost Breakdown : Ownership cost/hour : $12.64 NA <br />Operating cost/.hour : $19.77 100 <br />Operator costihour : $32.78 NA <br />Total unit cost/hour : $65.19 Total fleet cost/hour : $65.19 <br />MATERIAL QUANTITIES <br />Initial Swell Final <br />volume : 480 CCY factor : 1.125 volume : 540 LCY <br />Source of quantity take-off : Exhibit 1 SL9 <br />Source of estimated swell factor : CAT Handbook <br />HOURLY PRODUCTION (Cat HB) <br />Loader Cycle Time Unadjusted basic cycle time (load, dump, maneuver) : 0.475 minutes <br />Cycle Time Factors Factor (min.) Source <br />Material: Mixed material 0.020 (Cat HS) <br />Stockpile : No adjustment - factor not applicable 0.000 (Cat HS) <br />Truck ownership : Common ownership of trucks and loaders -0.040 (Cat HB) <br />Operation : Constant operation -0.040 (Cat HB) <br />Dump target : No adjustment - factor not applicable 0.000 (Cat HB) <br />Net cycle time adjustment <br />Adjusted basic cycle time <br />Rolling Resistance - Road Conditions <br />Haul : Rutted dirt, little maintenance, no water, 2" tire <br />Return : Rutted dirt little maintenance, no water, 2" tire <br />-0.060 minutes <br />0.415 minutes <br />Haul and Return Time Length <br />(feet) Grade res. <br />(%) Rolling res. <br />(%) Total res. <br />(%) Travel time <br />(minutes) Data <br />Source <br />Haul route : 500 2.00 5.00 7.00 0.4318 (Cat HB) <br />Return route : 500 -2.00 5.00 3.00 0.2820 (Cat HB) <br /> Total travel time : 0.7138 minutes <br />Loader Bucket Capacity Total cycle time : 1.129 minutes <br />Rated capacity : 1.70 LCY (heaped) (Cat HB) <br />Bucket fill factor : 1.100 Other - rock/dirt mixtures (100-120%) <br />Adjusted capacity : 1.87 LCY <br /> Source <br />Job Condition Correction Factors Altitude adjustment factor : 0.95 (Cat HB) <br />Site altitude : 7,500 feet Job efficiency factor : 0.83 (1 shift/day) <br /> Net correction : 0.79 multiplier <br />Unadjusted hourly unit production : 99.39 LCY/Hr <br />Adjusted hourly unit production : 78.38 LCY/Hr (Cat HB) <br />Adjusted hourly fleet production : 78.38 LCY/Hr <br />JOB TIME AND COST <br />Fleet size : 1 Loader(s) Total job time : 6.89 Hours <br />Unit cost : $0.832 /LCY Total job cost : $449 <br />
The URL can be used to link to this page
Your browser does not support the video tag.