My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-05-13_GENERAL DOCUMENTS - C1980001
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1980001
>
2009-05-13_GENERAL DOCUMENTS - C1980001
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:46:27 PM
Creation date
5/14/2009 10:00:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980001
IBM Index Class Name
General Documents
Doc Date
5/13/2009
Doc Name
Midterm Review Findings Document
Permit Index Doc Type
Findings
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION / DEMOBILIZATION <br />PROJECT IDENTIFICATION sheet 1 of 2 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Task # : 022 State : Colorado Permit/job #: C-1980-001 <br />Date : 0313112009 County :Routt Abbreviation :none <br />User: JDM Site :Edna Mine Filename :0001-022 <br />Permit or other job action :Midterm Review 2009 <br />Task description :Mobilize/Demobilize Equipment from Hayden <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br />Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 100T) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour : $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />NON-ROADABLE EQUIPMENT <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />-Cat D3G XL - 3P 9.81 $11.29 $88.67 1 $99.96 $88.67 $0.00 <br />-REEDRILL SK5AD, 7.0 in. 26.25 $49.29 $117.55 1 $166.84 $117.55 $0.00 <br />-Cat D9R - 9SU (2005) 66.73 $62.35 $125.45 1 $187.80 $125.45 $0.00 <br />-Cat 637G w/push-pull 59.08 $110.37 $125.45 2 $471.64 $250.90 $0.00 <br />-CAT 914G 8.10 $12.64 $88.67 1 $101.31 $88.67 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : [__$1,027.55 $671.24 $0.00
The URL can be used to link to this page
Your browser does not support the video tag.