Laserfiche WebLink
-4- <br />12. Primary future (Post-mininel land use (check onel: <br />Cropland(CR) Pastureland(PL) General Agriculture(GA) <br />Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br />Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br />X Developed Water Resources(WR) Solid Waste Disposal(WD) <br />13. Primary present land use (check one): <br />Cropland(CR) Pastureland(PL) General Agriculture(GA) <br />X Rangeland(RL) Forestry(FR) Wildlife Habitat(WL) <br />Residential(RS) Recreation(RC) Industrial/Commercial(IC) <br />Developed Water Resources(WR) <br />14. MethodofMinine: Briefly explain mining method (e.g.truck/shovel): Front end loaders, Bulldozers, <br />Scrappers Track HC2e, Off-read Haul tr u _kG and r•nnva)znr Rel is _ <br />15. On Site Processine: X Crushing/Screening <br />13.1 Briefly explain mining method (e.g. truck/shovel): Front end loaders, Bulldozers, <br />Scrapper, Track Hoe, Off-road Haul trucks and conveyor belts. <br />List any designated chemicals or acid-producing materials to be used or stored within permit area: None <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s).