Laserfiche WebLink
The Colorado Division of Wildlife has been contacted and requested to comment on the <br />pending operation and it's effect on the Wildlife and Wildlife Habitat. We are still <br />awaiting their response and will submit that correspondence as soon as it is received. <br />EXHIBIT I <br />SOILS INFORMATION <br />A general soils report was conducted by the NRCS in 2009. Soil thicknesses are based on <br />site observations and the NRCS soil survey. Topsoil and overburden thicknesses average <br />5.5 feet for the entire pit. The property owners and developers dug test pits to determine <br />these figures. <br />The NRCS report shows the topsoil sources in Map Unit 5 are poor, Map Unit 8 and 93 <br />are fair, while Map Unit 25 is a good topsoil source. <br />Natural Resources Conservation Service <br />Refer to NRCS attached documents (Exhibit I) <br />21