Laserfiche WebLink
III. COMMENTS -COMPLIANCE <br /> Below are comments on the inspection. The comments include discussion of observations made <br /> during the inspection. Comments also describe any enforcement actions taken during the inspection <br /> and the facts or evidence supporting the enforcement action. <br /> that there had been no further movement this spring. The area was included in the SL-3 Phase 1 bond release <br /> area, which was recently approved. <br /> Also, a repaired gully below Road "E-1", below a fenceline adjacent to the upper reach of Channel PM-22 was <br /> ground checked. There appeared to be some new rill formation in the repaired gully area. The location is <br /> subject to concentrated flow from snow accumulation areas adjacent to the road, which may not be practicable <br /> to divert. Installation of a stable TRM lined channel through the repaired gully location would appear to <br /> be warranted to prevent recurrence of the gully. <br /> Fish and Wildlife <br /> Numerous mergansers and a pair of mallards were observed on Pond 003, and a number of blue herons on <br /> Pond 002. <br /> Revegetation/Reclamation Success <br /> Spring growth of vegetation on the reclaimed areas has only recently initiated and due to seasonality these <br /> topics were not closely inspected. <br /> 4 <br />