My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-05-08_PERMIT FILE - M1978222UG
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M1978222UG
>
2009-05-08_PERMIT FILE - M1978222UG
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:46:18 PM
Creation date
5/13/2009 8:05:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978222UG
IBM Index Class Name
PERMIT FILE
Doc Date
5/8/2009
Doc Name
Storm water management plan
From
Nuvemco
To
DRMS
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MA`( 1 ?? 2o?q <br />pti??ion of and Sa etyma, <br />Mirrn9 an <br />INTRODUCTION <br />Nuvemco Monogram Mine <br />Storm Water Management Plan <br />Staging Area <br />Gw---, L?l <br />RECEIVED <br />MAY 0 8 2009 <br />GRAND JUNCTION FIELD OFFICE <br />DIVISION OF <br />RECLAMATION MINING & SAFETY <br />This storm water management plan has been prepared in response to the State of <br />Colorado Division of Reclamation, Mining and Safety's April 10, 2009 letter. A copy is <br />attached. <br />The hydrologic study area or staging area is shown on the attached map, T-2, and <br />photographs. The area has been graded to provide the following in the future: <br />• Ore bins; <br />• Loading area; <br />• Shipping container, C-Can, for storage; <br />• Shipping container, C-Can, for office; <br />• Equipment parking area; and <br />• Detention pond. <br />The two shipping containers are currently onsite to be used for storage and office <br />facilities in the future. None of the other items listed above have been constructed or <br />installed on the staging area. There is very little vegetation remaining on the site. <br />STUDY AREA <br />The area calculations are based on a pdf file that showed the proposed area at 1"=50'. <br />This file was placed into AutoCAD and the scaled areas were computed with the <br />following results. <br />Staging Area <br />The staging area will be bermed around the perimeter to prevent run on from the <br />surrounding area as can be seen on Map T-2. The berm will divert surface water flows <br />around the staging area and into the nearby drainage. On the south side of the study area, <br />flows will be diverted across the access road with a low water crossing. A ramp will be <br />constructed at the entrance to act as part of the earthen berm around the area. <br />The entire staging area, including the Ore Bin and Loading area is approximately 33,347 <br />square feet (sq ft). <br />Ore Bin and Loading Area <br />This area is approximately 40' wide by 95' long, with an area of 3,800 sq ft. The <br />attached drawing shows the concrete loading bins and apron and loading area. The area <br />will be surrounded by an earthen berm and all precipitation that falls within the Ore Bin <br />1
The URL can be used to link to this page
Your browser does not support the video tag.