My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-05-12_REVISION - C1981019
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2009-05-12_REVISION - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:46:26 PM
Creation date
5/12/2009 3:46:07 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
5/12/2009
Doc Name
Adequacy Response Review Memo
From
Dan Mathews
To
Jim Stark
Type & Sequence
TR72
Email Name
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• ? "medium thickness" zone, with a 14 to 2? inch replacement range and a <br />? inch mini.urri average thicl?ness, and; <br />? a "thicl? soil" zane, Ith a 3 0 inch to 48 Inch replacement range, and a ? G <br />Inch mini?nu?n average thickness. <br />Due to the length of time assaciated with review of TR?7Z, the resulting delay in <br />rec?amatian that has resulted, and the lacy of progress that has been made tov?ard <br />an approvable variable topsail rep?acen?ent plan, the Division mill impose the <br />following stipulation on the TR-7? proposed decision. <br />TIP?JLATION ? <br />WITHIN 60 DAYS OF TR 72 FINAL APPROVAL, THE PERMITTEE <br />WILL SUBMIT A COMPLETE TECHNICAL REVISION APPLICATXON <br />PROVIDING A DETAILED PLAN FOR VARIABLE THICKNESS <br />TOPSOIL REPLACEMENT, TO INCLUDE NARRATIVE AND <br />MAPPYNG THAT DELINEATES TOPSOIL REPLACEMENT ZONES OF <br />SPECIFIED THICKNESS RANGE AND NIINIMUM AVERAGE <br />THICKNESS. THE PLAN WILL CONTAIN DETAILS ,AND <br />COMMITMENTS ADEQUATE TO DEMONSTRATE COMPLIANCE <br />WITH RULE 4.U6.4{2}(A) AND ADEQUATE TO ENSURE THAT <br />ECOLOGICALLY SIGNIFICANT VARYATION IN SOIL THYCKNESS <br />WILL BE ACHIEVED (INCLUDING COMMITMENT TO <br />APPROPRIATE ANNUAL MONITORING AND REPORTING). <br />?VIAPPIN ?R NARRATI SILL ?LARIF'Y THL APPR?INIATE <br />EXTENT AND ENLRAL L?A.TY?N IMF ENHAN?L?NT . <br />PR??EDURE ENT??NED IN THL TR-7? NARRA'I'IV, IN?LEDXN <br />?YL BERN., E?TENI I?IL R?IJHENIN, AND N FENL <br />INTALLATI?N. <br />REI?LA?IATI?N ?PERATI?N IN?LUDXN TOP?ILIN AND <br />RE?ELTATI?N XLL PRO?E?D IN ?009? WHETHER ?R NAT A <br />VARIABLE T?P?IL REPLA?EIVINT PLAN I APPR?D. UNLL <br />AND ?JNTIL A ?ARIABLL THII?NE T?P?XL REPLA.?IVIENT <br />PLAN ? APPROVED B? THL DIVISII?N, T?PI??? REPLALENT <br />SILL ACHIEVE AN APPR?XINIATE UNIFORM THINE OF S <br />INCHES THROIJOH?UT THL POT???08 PORTIONS ?F THL <br />ORIGINAL PERNIxT AREA, A?ND 19.5 INCHES T?ROIJOHOi?T THE <br />SOUTH TA.?LOR RELAIVIATION AREA, <br />3
The URL can be used to link to this page
Your browser does not support the video tag.