Laserfiche WebLink
MAY-11-2009 13:55 <br />?kNF,13Y = X1&1' <br />r , <br />3032988748 P.13i14 <br />* 4-14-97 ; 3:37EN : 3038619026 9703561111;0 71 8 <br />b. Maintenance of water elevation in the three lakes is essential to <br />maintaining the flow of water in the McCanne Ditch. Rudy lilted agrees that <br />it will set Elie overflow pipes between the three lakes, as depicted on ExhibiE A, <br />at such elevations as to maintain a water elevation of 4,965.0 feet In the north <br />lake, labeled Ii-, I I I and IV on Exhibit A, a water elevation of .4,9 70.0 feet in <br />the middle lako, labeled V and VI on Exhibit A, and a water elevation of 4,973-0 <br />feet In the south lake, labeled VII and Vi l i on gihiblt A. Furthermore, Ready <br />Mixed will cover the dlkds with overburden material along the west side of each <br />of the lakes and the northwest side of the north lake to reduce seepage co the <br />river and along the east side of the north lake to minimize the hydraulic sannecCion <br />between the di?ch and the lake, Ready Mixed will construct a controlled overflow ' <br />from the northeast carrier of the north pond into the McCanne Ditch of at least <br />ten inches in diamater to allow this controlled overflow or- water into the McCanne <br />D1 Cch. <br />7. To prevent damage to the McCanne Ditch as a result of flooding, a <br />depression In the dice 5hou)4 be placed in the north lake on the north or northwest <br />portion of the duce as an emergency spi I )way so flooding water wi l l go to the <br />river. Ready nixed may, as required by the Urban Drainage and Flood Control <br />District, incorporate this depression into the Urban Drainage and Flood Control <br />District requirements. <br />8. Any proposed changes in the mining plan must he approved by McGartne. <br />9- McCanne agrees it will not raise any objections, legal or otherwise, <br />to Ready Mixesd`s application to the Mined Land Reclamation Board for a mining <br />permit nor object in Any way to Ready Mixed obtaining Ch. required zoning and <br />state permits to allow it to operate the mine on the subject property. <br />10. This Agreement shall be a covenant running with the land, shall be <br />binding upon the parties, their heirs, personal representatives, administrators. <br />successors and assigns and shall be enforceable. against the same. <br />I). This document represents the compere agreement of the parties hereto <br />and no oral m0dificatiOn, shall be re0g9nized. Any alllendmants or additions to <br />this Agreement xhali be made In writing signed by the parties. <br />IN VITNESS WHEREOF the McCanne Ditch and Reservoir Company has, by the <br />aurhoority of its Board of Directors, caused this Agreei=t to be executed <br />by Pcs President and attested by its Secretary and Ready Mixed Concrete Company <br />has, by the authority *of irs Board of Direccears, caused this Agreement ro be <br />executed by its President and attested by Its Secretary. <br />DATED the day and year first written above. <br />