My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-05-12_REVISION - C1981022
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981022
>
2009-05-12_REVISION - C1981022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:46:26 PM
Creation date
5/12/2009 10:19:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981022
IBM Index Class Name
REVISION
Doc Date
5/12/2009
Doc Name
Email Regarding Request for Assistance for Cost Estimate
From
Jim Stark
To
Marcia Talvitie
Type & Sequence
MR88
Email Name
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BOREHOLE SEALING WORK <br />PROJECT IDENTIFICATION <br />Task #: 201 State : Colorado Permit/job # : C-1981-022 <br />Date : 0511212009 County : Delta Abbreviation :none <br />User : JRS Site : Elk Creek Mine Filename : C022-201 <br />Agency or organization name : Colorado Division Of Reclamation, Mining And Safety <br />Permit or other job action : Minor Revision 88 <br />Task description : Plug and Seal Three Utility Boreholes <br />UNIT COSTS Equipment cost data source : NA Shift basis : 1 per day <br />BOREHOLE DESCRIPTION SEALING ITEM / METHOD DIAMETER LENGTH QUANTITY UNIT UNIT COST TOTAL COST <br />Seal 7" Holes (2) <br />-Bottom Plug PVC plug - 8 in. 7" 620' EA 2.00 EA $149.12 $298.24 <br />-Fill Holes with Cement Portland cement grout 7" 1,240' 166.00 bag $8.80 $1,460.80 <br />-Cut Casing at Surface Exp. casing removal, 8-16 in. 7" NA 4.00 LF $8.18 $32.72 <br />-Borehole Marker Borehole marker NA NA 2.00 EA $2.17 $4.34 <br />-Drill Rig Time ATLAS COPCO ROC D7-11, 4. NA NA 12.00 HR $162.70 $1,952.38 <br />-Water Truck Time Water Tanker, 2,500 Gal. NA NA 12.00 HR $56.94 $683.25 <br /> <br />Seal 18" Hole (1) <br />-Bottom Plug PVC plug - 12 in. 18" 620' 1.00 EA $226.49 $226.49 <br />-Fill Hole with Cement Portland cement grout 18" 620' 548.00 bag $8.80 $4,822.40 <br />-Cut Casing at Surface Exp. casing removal, 8-16 in. 18" NA 5.00 LF $8.18 $40.90 <br />-Borehole Marker Borehole marker NA NA 1.00 EA $2.17 $2.17 <br />-Drill Rig Time ATLAS COPCO ROC D7-11, 4. NA NA 12.00 HR $162.70 $1,952.38 <br />-Water Truck Time Water Tanker, 2,500 Gal. NA NA 12.00 HR $56.94 $683.25 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />JOB COST Total Cost : $12,159
The URL can be used to link to this page
Your browser does not support the video tag.