SHANNON i; WILSON, INC.
<br />•
<br />9.0 LIST OF
<br />Colorado Department of Natural Resources, Mined Land Reclamation Division, 2005,
<br />Regulations of the Colorado Mined Land Reclamation Board for Coal Mining: Denver,
<br />Colo., State of Colorado Department of Natural Resources, Mined Land Reclamation.
<br />2. CTL/Thompson, Inc., 1979, Excess spoils: Report prepared by CTL/Thompson, Inc., Job
<br />No. 5664B, for Energy Fuels Corporation, Steamboat Springs, Colo,, September 11.
<br />3. CTL/Thompson, Inc., 1982, Engineering and Design Manual for Disposal of Excess Spoil:
<br />Report prepared by CTL/Thompson, Inc., for U.S. Deparhnent of the Interior, contract
<br />number J5110084, November 30.
<br />4. CTL/Thompson, Inc., 1989, Contract Drilling and Laboratory Testing, Primary Crusher
<br />Retaining Wall, Colowyo Coal Company Mine, Moffat County, Colorado: Letter Report
<br />prepared by CTL/Thompson, Inc., Job No. 16,515, for Colowyo Coal Company, Meeker,
<br />Colo., December 12.
<br />5. CTL/Thompson, Inc., 1991a, Density and Stability Study, Refuse Disposal Area, New Elk
<br />• Coal Mine, Las Animas County, Colorado: Report prepared by CTL/Thompson, Inc., Job.
<br />No. 17,453, for Wyoming Fuel Company, Weston, Colo., Apri129.
<br />6. CTL/Thompson, Inc., 1991b, Geotechnical Investigation, Section 16 Excess Spoil Disposal
<br />Site, Colowyo Coal Mine, Moffat County, Colorado: Report prepared by CTL/Thompson,
<br />Inc., Job No. 17,544, for Colowyo Coal Company, Weston, Colo., March 29.
<br />7. CTL/Thompson, Inc., 1991c, Geotechnical Investigation, West Pit Excess Spoil Disposal
<br />Site, Colowyo Coal Mine, Moffat County, Colorado: Report prepared by CTL/Thompson,
<br />Inc., Job No. 16,516, for Colowyo Coal Company, Meeker, Colo., Rev. March 1.
<br />8. CTL/Thompson, Inc., 1992a, Underdrain Filter Requirements, West Pit and Section 16 Pit
<br />Excess Spoil Fills: Letter Report prepared by CTL/Thompson, Inc., Job No. 18,683, for
<br />Colowyo Coal Company, Weston, Colo., April 27.
<br />9. CTL/Thompson, Inc., 1992b, Waste Rock Pile Investigation/Design, Phase II, Geotechnical
<br />and Hydrologic Investigation: Report prepared by CTL/Thompson, Inc., Job No. 18,714,
<br />for Cyprus Yampa Valley Coal Company, August 14.
<br />10. CTL/Thompson, Inc., 1993, Geotechnical Investigation, South Taylor Excess Spoil Fill,
<br />Colowyo Coal Company, Moffat County, Colorado: Report prepared by CTL/Thompson,
<br />Inc., Job No. 35,853 for Kennecott Energy, Colowyo Coal Company, LP, Meeker, Colo.,
<br />Apri19.
<br />C~
<br />23-1-01105-200-Rl.doc
<br />23-1-01105-200
<br />13
<br />
|