Laserfiche WebLink
RULE 2 PERMITS <br />__ _. <br />_ _._ <br />For South Taylor highwall mining description, please see Volume 12, Rule 2.06.9. <br />Operation Conducted in Compliance with 4.23 <br />In the conduct of performing highwall mining, Colowyo will meet all applicable requirements of the Rules, and the <br />operation will be conducted in compliance with 4.23. <br />2.06.10 Coal Processing Plans and Support Facilities Not Located Within the Permit Area <br />This Subsection does not apply to the coal mining operations planned by Colowyo. <br />2.06.11 In-Situ Processing Activity <br />This Subsection is not applicable to the mining operations planned by Colowyo. <br />Rule 2 Permits 2.06-10 Revision Date: 1/06/09 <br />Revision No.: TR-77 <br />