civil, W11S?0OR1 'A°;.1_a t:: <br />The proposed revisions to the reclaimed storage configuration and mining sequence has no net change in the <br />maximum disturbed area reclamation cost after the initial slurry wall and embankment construction is completeled. <br />A summary of the currently approved and proposed reclamation plan construction cost estimates is included in <br />Table 1. For detailed breakdowns of both.plans" lease:see;Attachment B...... _ _......__ _ _ v_ .._w <br />Table 1 Bond Basis Summary <br />Task .....w. ._. ..... <br />. . Approved <br />_,__.. Proposed 30" <br />...................... Proposed 40' _ <br />Mobilization $7,355 $825,115 $1,163,458 <br />Site Work $88,182 $323,000 $323,000 <br />Slurry Wall and Embankment $822,930 $16,179,300 $22,946,160 <br />Engin: ! A1 Constr. Observ <br />?_?__ ............ . $204,625 <br />._.? .. .... $ 1,040,000 <br />_..? _ $1,108,000 <br />_. <br />Total $1,123,092 $18,367,415 525,540.618 <br />On April 1011, 2008 the bond for the approved reclamation project was reduced from $1,123,092 (above) to $800,000 <br />due to the slurry wall at Sharkey's Lake being constructed and approved by the SEO. The proposed reclamation <br />plan's total bond will be similarly reduced after the slurry walls are constructed and approved. <br />Please calm us if you have any questions. <br />Sincerely, <br />CIVIL RESOURCES, LLC. <br />Brad L. Hagen, P.E. <br />Principal l Civil Engineer <br />Cc: Robert Lembke, United Water & Sanitation District <br />Chris Hayes Esq.. The Hayes Law Firm, LLC. <br />Rocky Hoffschneider, Platte Sand & Gravel, LLC. <br />JIUniled Water -& San -14101crest Resource6TR I-Mine Sequence $ Storage Gonfig.doc <br />TR1-Giicrest Sequence & Storage Contig 2*