Laserfiche WebLink
3 (Form 2- .Public) <br />C. LOCATION MAP: Attach a USGS 7.5 minute quad, or similar map of adequate scale, which locates the prospecting <br />site(s). <br />D. Are prospect sites (e.g., drill holes, trench locations, etc...) staked on the ground? Yes No <br />E. Specify the Land Management Agency, Address and'I'elephone Number: <br />F. The prospector is required to document that the NOI has been sent to the BLM or the USES. Processing of the NOI will <br />not begin until the prospector has submitted evidence acceptable to the Division that the NOI was sent to the B.LM or <br />USFS. Check one: <br />Evidence of notification is attached to this NOI for BI,M Land <br />Evidence of notification is attached to this NOI for USFS Land. <br />Other proof of notice is attached to this NOI <br />II. MAPS & DRAWINGS <br />Accurate topographic base map showing the location of the proposed project must be submitted with this notice. The prospector <br />may submit a U.S.G.S. 7.5 minute quadrangle, or similar map of adequate scale that: <br />I . identifies the proposed prospecting site(s) or activity areas involving surface disturbance. Activity areas include all drill holes, <br />mud pits, excavations, trenches, adits, shafts, tunnels, rock dumps, stockpiles, impoundments and prospecting roads, and <br />2. includes sufficient detail to identify and locate known prospecting features and facilities that may be affected and those that <br />are not anticipated to be affected. This includes the location of all drill holes, mud pits, excavations, trenches, adits, shafts, <br />tunnels, rock dumps, stockpiles, impoundments and prospecting roads. Color photographs, adequately labeled (including <br />date, orientation and location), of the prospecting site may be used to fulfill this requirement if included with the NO.I <br />submittal. <br />III PROJECT DESCRIPTION <br />1. Ylineral(s) and/or Resource(s) being Investigated: <br />2. Ustintated dates of ?commencement and completion: <br />?utct /( ? C5? :3 <br />Cortlmf'i3Cf;nleitt: <br />Completion: <br />3. Amount of material to be extracted, moved or proposed to be moved:^ <br />4. Identify the type or method of prospecting proposed and quantity (place an "`+;") <br />Cuts Pits 'frenches <br />Shafts funnels Adits Declines <br />Jxx? n- Drilling Fluid Drilling - _Drilling & Blasting