Laserfiche WebLink
Demolition Work <br />Page 1 of 10 <br />Prolect Identification <br />Agency or organization name: Colorado Division of Minerals and Geology <br />Task #: 1 Perrnitgob#: 0982-056 <br />Date: 12152007 Abbreviation: N/A <br />User: jhb Filename: c:lhb/C82056/MR225/Demo sheet 2007 <br />Permitting action: MR225 Source of unit costs: CIRCES <br />Task description: Demolish structures, remove materials and debris <br /> file also saved as: c:lhb/C82056/MR225/demo sheet 2007.xls Last unit cost update: 2007 <br />STRUCTURE or ITEM DESCRIPTION CIRCES DEMOLITION MENU SELECTION QUANTITY UNIT UNIT COST TOTAL COST <br />(Dimensions in ft or cf unless noted) <br />t.power line to heater 2 powerpoles Powerline or telephone line, overhead, wood - Single pole 100 If $2.34 $ 234 <br />2. remove heater (dimensions from MR134) 10 x 10 X 20 Bldg. demo. and off-site disposal in approved landfill - Max. 5 mile haul 2,000 Cf $0.77 $ 1,530 <br />3. Remove propane tank Dim. 4 ft. dia x 8 ft. L ft. I Bldg. demo. and off-site disposal in approved landfill - Max. 5 mile haul 100 CIF $ 0.77 $ 77 <br />$ 1,841