Colowyo C-1981-019 <br /> 27 April 2009 <br /> Pg 414 <br /> Support Facilities: - The operator was working on regrading part of the <br /> shop/warehouse facilities area. The area was covered in thick mud. This mud was <br /> being removed and dry dirt was being brought in to reestablish the correct grade <br /> and elevation. <br /> - The Gossard Loadout area was stable and in good condition at the time of the <br /> inspection. There were no problems with fugitive dust from the coal stockpiles or the <br /> stacking tube. <br /> General Mine Plan Compliance: - The 101 dragline is on the East Pit highwall where it <br /> was waiting to performing reclamation (although it was not running at the time of the <br /> inspection and has not performed reclamation work since at least January 2009). <br /> - The 102 dragline was working on the west side of the West Pit removing C-Seam <br /> overburden. <br /> - The 103 dragline was also working on the west side of the West Pit removing C-Seam <br /> overburden. <br /> - The 114 shovel operation was working on removing the B1-Seam overburden in the <br /> South Taylor Pit. The overburden material from the 114 was being hauled and <br /> dumped in the C-C' fork of the East Taylor Fill. <br /> - The 115 excavator was removing B3-Seam overburden in the South Taylor Pit. The <br /> 115 overburden was also being dumped in the C-C' fork of the East Taylor Fill. <br /> - The mining at the Colowyo Mine appears to be progressing as discussed and <br /> approved in the PAP. <br /> Fish and Wildlife: There was a herd of elk (approximately 30) on the topsoil pile across <br /> from the facilities area and there was another small herd (approximately 50) on the <br /> East Pit reclaim. There were two bald eagles seen in the Taylor Draw area. <br /> Excess Spoil: The operator was currently dumping overburden from the South Taylor <br /> Pit in the C-C' fork of the East Taylor Fill. This fork of the fill has almost reached the <br /> bench where the rock crusher is located. Most of the area south of the rock crusher <br /> bench appears to be at or very near its final topography. The operator is <br /> constructing the pile in approximately 50-foot lifts as described in the approved plan <br /> in the permit. <br /> - The Streeter was free of snow and appeared to remain well vegetated and stable <br /> at the time of the inspection. No erosional features were noted on the surface of the <br /> fill. <br /> This completes the 19 February 2009 inspection report for the Colowyo Mine. <br />